Appendix A: Checklist for Completed Installation
Before initial start-up of the VRC, print this checklist and mark each item as it is confirmed "completed."
Mechanical Checks
Completed
Item
There is sufficient clearance for unit access and maintenance.
All fasteners and fittings are firmly secured.
Unit is oriented correctly in the rack cabinet: cool, supply air is at the front and hot, return air is at the back.
Foreign materials are removed from the area (shipping material, packaging, tools, etc.)
Condensate-drain piping is properly connected.
Electrical Checks
Completed
Item
Power-supply voltage meets the rated voltage on the unit name plate.
Unit is plugged-in to an appropriate supply outlet.
Communication and control cables are firmly connected.
Start-up Checks
Completed
Item
Confirm no alarms or warnings displayed.
Unit is operating without vibration or noise, and air is flowing.
System is operating within range of the set parameters.
35
Summary of Contents for VRC100 Series
Page 1: ...Vertiv VRC VRC100 Series Self contained Rack Cooler Installer User Guide 0 9 to 3 5 kW 60 Hz...
Page 4: ...Vertiv VRC Installer User Guide iv...
Page 6: ...Vertiv VRC Installer User Guide 2 This page intentionally left blank...
Page 14: ...Vertiv VRC Installer User Guide 10 This page intentionally left blank...
Page 24: ...Vertiv VRC Installer User Guide 20 This page intentionally left blank...
Page 32: ...Vertiv VRC Installer User Guide 28 This page intentionally left blank...
Page 36: ...Vertiv VRC Installer User Guide 32 This page intentionally left blank...
Page 38: ...Vertiv VRC Installer User Guide 34 This page intentionally left blank...
Page 40: ...Vertiv VRC Installer User Guide 36 This page intentionally left blank...
Page 42: ...Vertiv VRC Installer User Guide 38 This page intentionally left blank...