Vertiv
|
Aerial Ultracab Cross-Connect Enclosures (631-201-009)
|
Rev. F
21
Figure 9:
Jumper Wire Termination
Figure 10:
Placing Wire Between Washers on Binding Post
4.
Continue on to Routing Wire to route the wires.
Terminating Jumper Wires on RLS Blocks
For specific information on terminating wire pairs on RLS blocks, see document 641-202-002,
RLS50 Self-Strip
Block Description and Installation
. For information on dual wire termination to a pair, see document 641-202-
009,
RLS50 Self-Strip Block Feed-Thru Half-Tap Activator Kit
Description and Installation. Once you have
terminated a wire pair, continue on to Routing Wire to route the wires.