Vertiv
|
Aerial Ultracab Cross-Connect Enclosures (631-201-009)
|
Rev. F
18
2.
Secure the top bracket to the pole with a
5
/
8
-inch through bolt. Level the bracket before tightening the
bolt.
3.
Raise the unit using a block and tackle or winch line passed through a snatch block attached to the top
of the sling. Guide the unit during the hoisting operation with a hand line fastened to the bottom pole-
mounting bracket.
4.
Place the enclosure on top of the pole-mounted bracket and verify that both brackets on the enclosure
are properly engaged and sitting levelled on the pole bracket (see
5.
Secure the bottom pole mounting by drilling a
11
/
16
-inch hole through the pole and using a
5
/
8
-inch
through bolt (see
6.
Attach the supplied stabilizer bars to the bottom of the enclosure using the supplied "U" clamps, do not
tighten (see
NOTE!
Does not apply for 400 pair size units.
7.
Attach the other end of the stabilizer bars to the pole using two
3
/
8
-inch bolts per bar (see
).
NOTE!
Does not apply for 400 pair size units.
8.
Tighten all mounting hardware.
Figure 6:
Lifting Brackets and Stabilizer Bars
LIFTING
BRACKETS
STABILIZER
BARS
POLE