![Vertiv NetSure
7100 Series Installation Manual Download Page 47](http://html.mh-extra.com/html/vertiv/netsure-7100-series/netsure-7100-series_installation-manual_1007935047.webp)
Vertiv
|
NetSure 7100 Series -48V DC Power System Installation Manual (IM582127000)
|
Rev. BB
47
Figure 21:
Installing Battery Busbar Extension Kit, Part No. 554541
Front View
(One Row Cabinet
Shown, Others Similar)
Battery
(Return Side)
Busbar
Battery
(Load Side)
Busbar
GND RTN
-48V SUPPLY
1. Apply anti-oxidizing compound
to busbar mating surfaces.
2. Install hardware,
6 places per busbar.
Assembly Order:
3/8-16 X 1-1/4” Bolt
3/8” Belleville Washer
3/8” Flat Washer
Extension Plate
System Busbar
3. Torque to 180 in-lbs.
Central
Office
Ground