![Vertiv NetSure
7100 Series Installation Manual Download Page 166](http://html.mh-extra.com/html/vertiv/netsure-7100-series/netsure-7100-series_installation-manual_1007935166.webp)
Vertiv
|
NetSure 7100 Series -48V DC Power System Installation Manual (IM582127000)
|
Rev. BB
166
Figure 81:
List AJ: -48V Distribution Panel, (4) TPL-B Fuse Positions (without Shunts) (without Return
Busbar)
Figure 82:
List AK: -48V Distribution Panel, (4) TPL-B Fuse Positions (with Shunts) (without Return Busbar)
-48VDC Load
Connections
LOAD CONNECTIONS
3/8-16 Studs on 1” Centers
(Customer must supply or order additional hardware)
Maximum Lug Width: 1.5 inches.
Observe proper
polarity when making
load connections.
WARNING!
-48VDC Load
Connections
LOAD CONNECTIONS
3/8-16 Studs on 1” Centers
(Customer must supply or order additional hardware)
Maximum Lug Width: 1.5 inches.
Observe proper
polarity when making
load connections.
WARNING!