Vertiv
|
NetSure 710 Series Installation Manual (IM581127000)
|
Rev. U
134
NOTE!
Check you numbering to be sure it is correct. If there where conflicts in your numbering,
converters with conflicts will be assigned the next available sequential number.
13.
Return to the Main screen by repeatedly pressing ESC (escape).
ACU+ Alarm Relay Check
To verify operation of the external alarm relays, use the ACU+ alarm relay test feature. Refer to the ACU+
Instructions (UM1M820BNA) for instructions in using this feature.
NOTE!
The relays may be preprogrammed for specific functions. Refer to the configuration drawing (C-
drawing) supplied with your system for your system’s specific configuration.
NCU Controller Procedure
Refer to this section if your system is furnished with an NCU Controller.
NCU Controller Initialization
Refer to the NCU Instructions (UM1M830BNA) for detailed instructions.
for locations of the NCU local indicators and navigation keys.
Figure 79:
NCU Local Indicators and Navigation Keys
Procedure
NOTE!
The initialization routine takes several minutes. During that time various alarm indicators may
illuminate on the NCU front panel and an audible alarm may sound. Disregard all alarms. An audible
alarm can be silenced at any time by momentarily depressing the
ENT
key on the NCU Controller.
1.
After the NCU is powered on, the display shows the “logo” screen. The controller is initializing.
Status
Indicator
(Green)
Minor Alarm
Indicator (Yellow)
Critical or
Major Alarm
Indicator
(Red)
Menu
Navigation
Keys
USB
Port
10/100M Ethernet
Port (RJ-45)
M830D
ESC
ENT