TABLE OF CONTENTS
2 Installing the Liebert SiteLink-E Module
2.1 Preparations for Mounting the Module
2.1.1 Choose a Location to Install the Liebert SiteLink-E
3.1.1 Input Power Requirements
3.2 Connect Input Power—AC or DC
4 Communication and Control Wiring
4.2 RS-485 and ARC156 Wiring Considerations
4.3 Wiring for BACnet/ARC156 Network
4.4.1 Wiring Port S1 for RS-485 Network—Four-Wire
4.4.2 Wiring Port S1 for RS-485—Two-Wire
4.4.3 Wiring Port S1 for RS-232
4.5 Wiring a Modem for Half-Router Communication—Port S1
Appendix A: Communication Protocol and Wiring Considerations
Vertiv
| Liebert® SiteLink-E™ Installation Manual |
3
Summary of Contents for Liebert SiteLink-12E
Page 1: ...Liebert SiteLink E SiteLink 2E SiteLink 4E and SiteLink 12E Installation Manual...
Page 4: ...Vertiv Liebert SiteLink E Installation Manual 4...
Page 6: ...Vertiv Liebert SiteLink E Installation Manual 6 This page intentionally left blank...
Page 9: ...Figure 2 4 Enclosure dimensions Floor mount Vertiv Liebert SiteLink E Installation Manual 9...
Page 10: ...Vertiv Liebert SiteLink E Installation Manual 10 This page intentionally left blank...
Page 20: ...Vertiv Liebert SiteLink E Installation Manual 20 This page intentionally left blank...
Page 25: ......