11
Figure 6
Electrical connection locations, sidecar unit
Neutral Connections
Distribution Cables Neutral(s)
connected to distribution
panelboard neutral busbar
Panelboard Main Circuit Breaker
Factory-Wired
Distribution Panelboard
Distribution Cable Conduit Connection
Cable Tray 1-3/32" (27.8mm) holes for
3/4" conduit fittings and 7/8" (22.2mm)
holes for 1/2" conduit fittings provided for
securing optional distribution cables
Ground Connections
Distribution Cable Ground(s)
connected to distribution
panelboard ground busbar
Interconnection Wiring
provided by factory
NOTES
1. The unit bolts to the main
Liebert Precision Power Center. See
installation manual for instructions.
2. Site panel is taken from the Liebert PPC
and installed to either the left or right side
of the unit.
FRONT VIEW WITH DOOR OPEN
AND PANEL REMOVED
PPC15010
Rev. 2
Summary of Contents for Liebert PPC
Page 2: ......