Battery Installation
Vertiv
Large System, 3-Phase UPS Battery System Installation Manual
16
2.4.2
Connected or Stand-Alone Arrangement
For battery cabinets that connect to a Liebert UPS, (see
through
), cables will run from the positive
and negative busbars of the adjacent battery cabinet to the positive and negative DC connections of UPS. For
battery cabinets that are connecting to a Liebert junction cabinet (see
through
connected from the positive and negative busbars of the adjacent battery cabinet to the positive and negative
DC connections of the junction cabinet.
For systems with the cabinets bolted to each other but not connected to a Liebert UPS, the factory-supplied
cables can run internal to the cabinets.
For systems with the cabinets not bolted to each other, the cables must be run outside the cabinets. The
customer must supply all the interconnecting cables and hardware. For cabinets that are ordered as stand-alone,
the customer must supply all the interconnecting cables and hardware. See the UPS installation manual for
current ratings and recommended cable sizes.
2.4.3
Grounding
For cabinets that have been ordered as connected or attached, the ground cables and hardware will be supplied.
See
for location of cabinet-to-cabinet grounding.
For cabinets ordered as detached or stand-alone, customer must supply the cables and hardware. See the
terminal detail drawings for the ground busbar’s location.
2.5
C
ONTROL
C
ONNECTIONS
Each Liebert battery cabinet contains a Battery Interface Board (BIB). See
. All
cabinets in a system must have their Battery Interface boards connected in series. See
, through
through
Use Belden 9156 equivalent wire. Total length of cable from UPS to all battery interface connections must be less
than 1000 ft. (300m). All interconnecting cables and hardware for connected cabinets is factory-provided.
Figure 13
Control cable layout—Liebert UPS to Liebert battery cabinet
NOTICE
Risk of improper installation. Can cause equipment damage.
During system commissioning, Vertiv Liebert Services will set the jumpers on the (External Interface Board) EIB and the
BIB. If another battery cabinet is added to the system after commissioning, it is imperative that Liebert Services reset the
jumpers on the EIB board and the BIB board.
NOTE
Care must be taken to route the control cables away from high-voltage cables and busbars.
Liebert
UPS
Liebert
Battery
Cabinet
Liebert
Battery
Cabinet
Interface
Board
Bat. Interface
Board (BIB)
TB1154
Bat. Interface
Board (BIB)
TB1154
CAN Cable
CAN Cable
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...