Battery Installation
Vertiv
Large System, 3-Phase UPS Battery System Installation Manual
8
2.2
L
AYOUT
Depending on the site layout, the battery cabinets can be installed in any of several ways:
• Connected to Module—One or more battery cabinets bolted to the UPS
• Stand-Alone Individual Cabinets—Single battery cabinets not bolted to the UPS
• Stand-Alone Interconnected Cabinets—Multiple battery cabinets not bolted to the UPS
for top terminal battery cabinets.
through
for front terminal battery cabinets.
Figure 3
Top-terminal battery system configurations—Liebert
e
XL
™
47"
(1194mm)
Battery
Cabinet
47"
(1194mm)
Battery
Cabinet
47"
(1194mm)
Battery
Cabinet
15-½"
Junction
Cabinet
(May be on
either end
or between
any battery
cabinets)
625-750kVA
Stand-Alone
Interconnected
Systems
47"
(1194mm)
Battery
Cabinet
47"
(1194mm)
Battery
Cabinet
47"
(1194mm)
Battery
Cabinet
S
p
a
c
e
r
Liebert
UPS
625-1200kVA
One or more battery cabinets
bolted to the UPS
Battery cabinets must be on the
left side of the UPS.
47"
(1194mm)
Battery
Cabinet
47"
(1194mm)
Battery
Cabinet
47"
(1194mm)
Battery
Cabinet
17-½"
Junction
Cabinet
(May be on
either end
or between
any battery
cabinets )
800-1200kVA
Stand-Alone
Interconnected
Systems
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...