The 1/0 dry contact port capacity. 125Vdc, 0.5A; 30Vdc, 7A 

Pin11 and Pin12 reserves the corresponding terminals for configuring the REPO function. The  REPO device 
also needs the shielded cable to connect to the Normally Open remote REPO  switch between the two 

terminals. If not necessary. you should disconnect Pin9 and Pin 10. 

Pin9 and Pin10 have been shorted before delivery. 

The EPO action of the UPS will close the  rectifier, inverter and static bypass, but it cannot  disconnect 

the UPS  from mains input. If you want to disconnect the UPS completely, just  disconnect the upstream 

input MCB when generating the EPO. 

In emergency conditions, close the REPO switch (prepared by users) to shut down the  rectifier and 

inverter, and the UPS is powered off. In normal condition, the REPO switch  cannot cut off the UPS input 

power. If a switch of electronic control tripping function is adopted at the UPS input, the REPO switch 

helps the switch to trip and thus cuts off the  UPS input power. The position of the REPO switch is 
shown in Figure 1-3, and the  REPO  cable connection is shown in Figure 6-3. 

REPO  switc 

Figure 6-

5

 

The cable connection procedures are as follows: 

REPO cable connection 

l Loosen the '11' and '12' connection terminals of the REPO port

;,:; 

[T] 

-0 

REPO 

plug 

10 
Jl 
12 

2. Insert the two ends of the copper core cables with the insulation leather peeled into the  '11' and '12'

connection terminals of the REPO port, and press down the terminals. The REPO  cable connection is

complete. Ensure that the REPO cable is firmly connected to avoid no  action or wrong action of the

REPO caused by accidental dropping or infirm contact

3. For parallel UPSs, when connecting the REPO cable, users should parallelly connect '11' of  the REPO

port with one end of the electronic switch, and parallel connect '12' with the  other end of the electronic

switch.

When the REPO switch at the user end closes, the UPS generates an alarm and cut off  the output 

immediately, and the UPS will not return to the normal operation  state  automatically. At this point, 

you must change the REPO switch state, and power on  the  UPS  manually. 

1. It 

is 

recommended  to use 0.82mm

~ 0.33mm

(signal cable of 18A WG ~ 33AWG) copper  core cable.

2. If the switch you have configured 

is 

of electronic control tripping function, when  the REPO  signal takes

action, you need to close the switch before restart the UPS.

Vertiv I Liebert�  ITA2  ., 5kVA ~ 20kVA UPS  I User Manual 

·102 

Summary of Contents for Liebert ITA2

Page 1: ...5 20 kVA User Manual...

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ...Vertiv disclaims any and all responsibility or liability for the defects or malfunction caused by...

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ...Product Model 5kVA 6kVA 10kVA 16kVA 20kVA...

Page 11: ...TABLE OF CONTENTS 1 Product Introduction 1 1 2 3 3 3 5 7 7 8 9 10 10 10 11 12 2 Single UPS Installation And Commissioning 14 15 17 17 17 17 19 20 20 21 21 21 22 23 26 29 39 44 44 44...

Page 12: ...45 46 3 Parallel UPS Installation And Commissioning 47 47 48 49 50 52 53 56 56 57 57 59 59 60 60 61 62 4 Operation And Display Panel 6 63 64 64 65 66 70 70 70 71 71 72 76 77 78...

Page 13: ...5 UPS Operation Instructions 8 84 84 84 85 86 87 88 89 89 90 90 91 93 97 6 Communication 99 99 99 99 101 103 103 103 7 Maintenance 104 104 104 105 106 106 8 Options 107 107 108 108 108 109...

Page 14: ...111 113 114 114 114 116 9 Attachment 117 117 117 117 Appendix 1 LCD Parameters Setting 119 Appendix 2 Glossary 122 Appendix 3 Hazardous Substances And Content 123...

Page 15: ...1 Product Introduction The...

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ...Battery...

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ...2 SingleUPSInstallationAnd Commissioning...

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ......

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ......

Page 48: ......

Page 49: ......

Page 50: ......

Page 51: ......

Page 52: ......

Page 53: ......

Page 54: ......

Page 55: ......

Page 56: ......

Page 57: ......

Page 58: ...BAT...

Page 59: ......

Page 60: ...UPS and two battery modules Terminal B 0 Wiring diagram between 16kVA 20kVA UPS and two battery modules Figure 2 31 Cable connection diagram between the battery module and UPS Vertiv I Liebert ITA2 5...

Page 61: ......

Page 62: ...he rectifier is finished 3 Finish and check the p arameter settin g s of the sin g le UPS a At main menu screen p ress the E I or B ke y to select Settin g s and p ress the Illke y to enter the interf...

Page 63: ...ellow If the battery is connected the alarm indicator turns off 2 7 4 Battery Mode Start Up 1 Close the battery MCB and press the power button on the UPS front panel for two seconds the LCD displays t...

Page 64: ...3 ParallelUPSInstallationAnd Commissioning...

Page 65: ......

Page 66: ......

Page 67: ......

Page 68: ......

Page 69: ......

Page 70: ......

Page 71: ......

Page 72: ......

Page 73: ......

Page 74: ......

Page 75: ......

Page 76: ......

Page 77: ......

Page 78: ......

Page 79: ...4 Operation And Display Panel...

Page 80: ......

Page 81: ......

Page 82: ......

Page 83: ......

Page 84: ......

Page 85: ......

Page 86: ......

Page 87: ...Log 00 0 0 00 20 Outp ut Battery y test time Batte ry serie s Disc hg protr ct time Equa l Paral lel able Tem p...

Page 88: ...Maintain...

Page 89: ......

Page 90: ......

Page 91: ......

Page 92: ......

Page 93: ......

Page 94: ......

Page 95: ......

Page 96: ......

Page 97: ......

Page 98: ......

Page 99: ......

Page 100: ...5 UPS Operation Instructions...

Page 101: ......

Page 102: ......

Page 103: ...Confirm S Turn off UPS ol NO YES Log About Maintain...

Page 104: ...with...

Page 105: ......

Page 106: ......

Page 107: ...5 Press the key for several times to back to the main menu screen...

Page 108: ......

Page 109: ......

Page 110: ......

Page 111: ......

Page 112: ......

Page 113: ......

Page 114: ......

Page 115: ...Communication UNITY DP Card Important We recommend using shielded cables in order to increase EMC The appearance of IS UNITY DP card is shown in Figure 6 2 Figure 6 2 IS UNITY DP card IS UNITY DP Car...

Page 116: ...IS UNITY LIFE Card Important We recommend using shielded cables in order to increase EMC The appearance of the IS UNITY LIFE card is shown in Figure 6 3 Figure 6 3 Appearance of IS UNITY LIFE card For...

Page 117: ...4...

Page 118: ...e 6 5 The cable connection procedures are as follows REPO cable connection l Loosen the 11 and 12 connection terminals of the REPO port T 0 0 REPO plug 9 10 Jl 12 2 Insert the two ends of the copper c...

Page 119: ......

Page 120: ...7 Maintenance...

Page 121: ......

Page 122: ......

Page 123: ...8 Options...

Page 124: ......

Page 125: ......

Page 126: ......

Page 127: ......

Page 128: ......

Page 129: ......

Page 130: ......

Page 131: ...The standard battery cabinets are listed in Table 8 8 Corresponding battery CSB Dimension Weight...

Page 132: ......

Page 133: ...9 Attachment...

Page 134: ......

Page 135: ...Appendix 1 LCD Parameters Setting...

Page 136: ......

Page 137: ......

Page 138: ...Appendix 2Glossary...

Page 139: ...Appendix 3 HazardousSubstances AndContent...

Page 140: ...trademarks or registered trademarks of their respective owners While every precaution hasbeentakentoensureaccuracyandcompletenesshere VertivGroupCorp assumesnoresponsibility anddisclaimsallliability...

Reviews: