Vertiv™ | Liebert® AHU | User Manual
13
The tools mentioned in
are generic and commonplace; however, depending on various factors such as site
environment, local rules and regulations, cables, installation equipment, and on-site electrical connections these tools may
vary in a real time scenario.
Ensure that the tools used in the installation, operation, and maintenance processes are insulated.
2.2.5. System Arrangement during Installation
Note1:
Factory piping
Note2:
Field piping (by technical personnel)
Note3: The single system is used as an example.
Note4: Components (marked with *) are not supplied by Vertiv but are recommended for proper circuit operation and
maintenance.