Vertiv™ NetSure™ Supervision Module for Distribution Unit Plus Installation and User Manual
6
3
Installation
3.1
Mounting
The Vertiv™ NetSure™ SM-DU+ assembly provides mounting holes in each corner. Refer to Figure 1.2 for location and dimensions.
4
Electrical Connections
4.1
Important Safety Instructions
DANGER!
Adhere to the “Important Safety Instructions” starting on page v.
4.2
Wiring Considerations
4.2.1
General
All wiring should follow the current edition of the American National Standards Institute (ANSI) approved National Fire Protection
Association's (NFPA) National Electrical Code (NEC), and applicable local codes. For operation in countries where the NEC is not
recognized, follow applicable codes.
4.2.2
Input Fusing
The ungrounded input lead should be fused at 1-1/3 ampere.