Vermont Castings Brookhaven 20DVT Installation Instructions And Homeowner'S Manual Download Page 6

Brookhaven Direct Vent Gas Fireplace

6

10009459

Framing and Finishing 

Check fireplace to make sure it is levelled 
and properly positioned.

To mount the appliance:
1.  Choose the location.
2.  This unit comes with four (4) flanges pre-mounted 

on both sides of the fireplace to allow two different 
drywall thicknesses to be used. Flange “A” is for 
1/2” drywall while flange “B” is for 5/8” drywall.

3.  Bend the desired flanges out 90° on both sides of 

the fireplace. Slide the fireplace into the framed 
opening until the flanges contact the front surfaces 
of the framing. Level the unit and secure it firmly in  
place.

Fig. 4

  Nailing flanges.

 

Flange 

Drywall

  Position 

Depth

 

1/2” / 13 mm

 

5/8” / 16 mm

Flange Location for 

Desired Drywall Depth

FP1539

Noncombustible materials such as brick or tile may be 
extended over the edges of the face of the fireplace. 

DO NOT

 cover any vent or grille panels.

If a Trim Kit is going to be installed on the fireplace, the 
brick or tile will have to be installed flush with the edges 
of the fireplace.

Final Finishing

20DVT

Certified To

ANSI Z21.88-2005 / CSA  2.33-2005

Vented Gas Fireplace Heaters

  Inlet Minimum 

5.5” w.c. 

11.0” w.c.

  Inlet Maximum 

14.0” w.c. 

14.0” w.c.

  Manifold Pressure 

3.5” w.c. 

10.0” w.c.

Gas Inlet and Manifold Pressures

 

Natural 

LP (Propane)

High Elevations

Input ratings are shown in BTU per hour and are 
certified without deration for elevations up to 
4,500 feet (1,370m) above sea level.
For elevations above 4,500 feet (1,370m) in USA, 
installations must be in accordance with the cur-
rent ANSI Z223.1/NFPA 54 and/or local codes hav-
ing jurisdiction.
In Canada, please consult provincial and/or local 
authorities having jurisdiction for installations at 
elevations above 4,500 feet (1,370m).

Gas Line Installation

When purging the gas lines, the front win-
dow frame assembly must be removed.

The gas pipeline can be brought in through the rear 
of the appliance as well as the bottom. Knockouts are 
provided on the bottom behind the valve to allow for the 
gas pipe installation and testing of any gas connection. 
It is most convenient to bring the gas line in from the 
rear right side of the valve as this allows fan installation 
or removal without disconnecting the gas line.
The gas line connection can be made with properly 
tinned 3/8” copper tubing, 3/8” rigid pipe or an ap-
proved flex connector. Since some municipalities have 
additional local codes, it is always best to consult your 
local authority and the National Fuel Gas Code, ANSI 
Z223.1/NFPA 54 in the USA or the CSA-B149.1 installa-
tion code.

Always check for gas leaks with a mild soap 
and water solution applied with a brush no 
larger than 1” (25 mm). Never apply soap 
and water solution with a spray bottle. Do 
not use an open flame for leak testing.

A

B

FP1626
flange location
5/06

Unit: GFDN4B0

    

 

 

Max. 

Min. 

Air

    

 

 

Input  Input 

Shutter

  Model 

Fuel  Gas Control  BTU/h  BTU/h  Setting

    

 

 

 

 

Sides & 

   20DVTRN  Nat.  Millivolt Hi/Lo  13,000  8,700 

Bottom 

    

 

 

 

 

Half Open

    

 

 

 

 

Sides &

  20DVTRP  Prop.  Millivolt Hi/Lo  13,000  8,700 

Bottom 

    

 

 

 

 

Half Open

Gas Specifications

Summary of Contents for Brookhaven 20DVT

Page 1: ...the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLO SION MAY RESULT CAUSING PROPERTY DAMAGE PER SONAL INJURY OR LOSS OF LIFE PLEASE READ THIS MANUAL BEF...

Page 2: ...Gas Line Installation 6 General Venting Information General Venting 7 General Venting Information Termination Location 8 General Information Assembling Vent Pipes 9 Flex Vent Pipes 9 Twist Lock Pipes...

Page 3: ...on and ventilation air must not be ob structed in any way 11 When replace is installed directly on carpeting vinyl tile or any combustible material other than wood the replace must be installed on a m...

Page 4: ...ions L 31 806 mm M 44 1140 mm N 23 587 mm O 21 540 mm P 34 864 mm Q 15 394 mm 20DVT Fireplace Dimensions Fig 2 Fireplace speci cations and framing dimensions O Rough Opening Width K F Q Rough Opening...

Page 5: ...From Side Ref Leg Depth Ref of Comb Opening F 12 305 mm K 12 305 mm G 9 229 mm L 9 229 mm H 6 152 mm M 6 152 mm I 4 102 mm N 4 102 mm J 3 76 mm O 3 76 mm Fig 3b Combustible mantel leg minimum installa...

Page 6: ...r elevations above 4 500 feet 1 370m in USA installations must be in accordance with the cur rent ANSI Z223 1 NFPA 54 and or local codes hav ing jurisdiction In Canada please consult provincial and or...

Page 7: ...tall switch into receptacle box Attach cover plate to switch 3 Connect wiring to gas valve Fig 6 TPTH TH TP FP1218 Remote switch wiring 8 02 Remote ON OFF Switch FP1218 Fig 6 Remote switch wiring diag...

Page 8: ...91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 othe...

Page 9: ...e Apply High Tem perature Sealant Hose Clamp FP1471a Fig 8 Apply high temperature sealant to 4 and 7 pipes Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with...

Page 10: ...k Pipes When using CFM Corporation twist lock pipe it is not necessary to use sealant on the joints The only areas of the venting system that need to be sealed with high temperature silicone sealant a...

Page 11: ...duced to 17 5 2 m In Figure 13 Dimension A plus B must not be greater than 17 5 2 m The maximum number of 45 elbows permitted per side wall installation is two 2 These elbows can be installed in eithe...

Page 12: ...p i e from the elbow to the outside wall nish plus 2 or the distance required if installing a second 90 elbow Fig 18 Always install horizontal venting on a level plane X X FP1181 Fig 17 Vertical heigh...

Page 13: ...pacer springs 6 165mm FP1475 flex 90 bend 4 04 djt FP1475 Fig 20 Bend ex vent at 90 so horizontal portion is 6 165 mm off top of unit STEP 4 Install the 4 102 mm ex vent pipe to the appliance collar a...

Page 14: ...the horizon tal plane the maximum horizontal length must be reduced by 18 450 mm Example Maximum horizontal length No elbows 10 3 m 1 x 45 elbow 8 5 2 6 m 2 x 45 elbows 7 2 1 m A minimum of an 8 2 5m...

Page 15: ...In all cases the opening must provide a mini mum of 1 25 mm clearance to the vent pipe i e the hole must be at least 9 x 9 240 x 240 mm 5 Place replace into position 6 Place restop s 7DVFS or Attic In...

Page 16: ...r Vent to Vertical Vent 90 Elbow 7TDV90 Vertical Horizontal Offset Telescopic vent sections 7TDVP1117 11 to 17 adjustable length 7TDVP3567 35 to 67 adjustable length Pipe sections for vertical or hori...

Page 17: ...onia household cleaner and warm water gas replace glass cleaner is recommended After the initial cleaning process the glass should be cleaned two or three times during each operating season depending...

Page 18: ...n of Logs The logs are fragile and should be handled with care Keep the packaging material out of the reach of children and dispose of the mterial in a safe manner The individual logs can be easily id...

Page 19: ...tating the Hi Lo adjustment knob located near the centre of the gas control Fig 33 or 34 Flame Characteristics It is important to periodically perform a visual check of the pilot and the burner ames C...

Page 20: ...tly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try t...

Page 21: ...rning no gas to A Wall switch or wires defective Check wall switch and wires for proper connections main burner Jumper wires across terminals at wall switch if burner comes on repalce defective wall s...

Page 22: ...m assembly FC107 D E F FC108 SIT regulator conversion 10 03 OF F P I L O T O FC108 Fig 38 Replace regulator Burner Ori ce Conversion 1 Remove two 2 burner housing assembly mounting screws Fig 39 2 Lif...

Page 23: ...stall conversion pilot ori ce 4 Reinstall pilot hood and be sure to align with index tab 5 Turn the gas supply valve and gas valve on and test for leaks Use a 50 50 solution of liquid soap and water t...

Page 24: ...May Be HOT 1 Turn off pilot light at gas valve side 2 Let replace cool if it has been running 3 Remove window frame assembly Refer to Window Frame Assembly Removal section 4 Remove logs 5 Vacuum burn...

Page 25: ...a 1b 2 3 4 5 7a b 8a b 12 13 9 14 10 16 17 18 20 21 22 24 9459 20DVT parts 5 06 19 15 Ref Description 20DVT 1 Log Set Complete 10009451 1a Log Rear J11 1b Log Front J12 2 Lava Rock Pkg 10001454 3 Embe...

Page 26: ...ctrode Ignitor w Cable RN RP 10001297 15 Ignitor Piezo w Nut 50932 16 Valve SIT 820 662 RN 20010563 17 Flexible Gas Line w ON OFF Shut Off Valve 10009064 18 Frame Window w Glass Assy 10009485 19 Conso...

Page 27: ...nd supported Installation Instructions 1 Remove window frame assembly and logs 2 Place rear ceramic panel in back of unit Fig 44 3 Place side panels 4 Re install logs and window frame assembly Optiona...

Page 28: ...Brookhaven Direct Vent Gas Fireplace 28 10009459...

Page 29: ...10009459 29 Brookhaven Direct Vent Gas Fireplace...

Page 30: ...Brookhaven Direct Vent Gas Fireplace 30 10009459...

Page 31: ...p Ifuponinspection thedamageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of t...

Page 32: ...Ratings EnerGuide Ratings D O E Model Fireplace Ef ciency Steady State AFUE 20DVTRN 60 1 80 64 20DVTRP 60 1 81 64 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmcorp com CFM C...

Reviews: