10
Vermont Castings Aspen
®
II Multi-Fuel
30003892
34
FLUEPIPECLEARANCES
D
at least
3 x D
elevation
without
Shield
elevation
with Shield
at least
3 x D
at least
1.5 x D
at least
1.5 x D
plan without
Shield
plan with
Shield
Air space of at least 12 mm
between noncombustible shield
and combustible material
Fluepipe
at least
1.5 x D
at least
1.5 x D
at least 3 x D
D
at least
1.5 x D
ST911
fig. 11
Connecting fluepipe clearances.