The steps in the following sections assume that the appliance and one or more
storage shelves are shipped together and installed at the same time.
Refer to the following sections as needed.
See “Connecting a 4TB appliance to one storage shelf” on page 37.
See “Connecting a 4TB appliance to more than one storage shelf” on page 39.
Connecting a 4TB appliance to one storage shelf
The steps in this section assume that the 4TB appliance and the storage shelf are
shipped together and installed at the same time.
37
Installation procedures
Connecting a 4TB appliance to one storage shelf
Summary of Contents for NetBackup 5240
Page 4: ......
Page 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Page 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Page 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Page 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...