Adding Expansion Storage
Shelves to an operating
appliance that does not
have any Expansion
shelves
This appendix includes the following topics:
■
■
Turning off the existing hardware
■
■
Connecting one Expansion Shelf to the Primary Shelf
■
Connecting two Expansion Shelves to the Primary Shelf
■
Connecting three Expansion Shelves to the Primary Shelf
Overview
This appendix applies to an operating appliance that has one or two compute nodes
and a Primary Storage Shelf. It is possible to already have one or more Expansion
Storage Shelves, up to three units.
The cable scheme for NetBackup and Flex appliances is the same.
A
Appendix