7
Verify the final cable configuration.
8
Connect the power cords of all devices as described in this section.
See
on page 74.
9
Turn on the devices in the proper sequence as described in this section.
See
“Turning on the hardware and verifying operation”
on page 77.
10
Add the new disk space with the instructions in one of these sections.
See
“Adding the disk space of an Expansion Storage Shelf from the NetBackup
on page 115.
See
“Adding the disk space of an Expansion Storage Shelf from the NetBackup
on page 117.
Connecting two Expansion Shelves to the Primary
Shelf
Both Expansion Shelves connect to the Primary Shelf but not directly to the compute
node.
94
Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
Connecting two Expansion Shelves to the Primary Shelf