background image

Verasys Boiler Controller Quick Start Guide

5

GR

OU

N

D

TX

-1

24

V

A

C

24

V

CO

M

12

0

V

A

C

PO

W

E

R

   

    

     

    

 1

2

0

V

A

C

GR

OU

N

D

PS

-1

24

V

A

C

24

V

CO

M

SA

SA

1

2

4

8

16

32

64

12

8

ON

Address:

SA

FC

OU

T

 9

OC

OM

 9

OU

T

 1

0

OC

OM

 1

0

O

U

T1

1

OC

OM

 1

1

OU

T

 1

2

OC

OM

 1

2

OU

T

 1

3

OC

OM

 1

3

OU

T

 1

4

OC

OM

 1

4

OU

T

 1

5

OC

OM

 1

5

OU

T

 1

6

ANALOG OUTPUT

HO
T

24V

CO
M

IOM5731

SA

 

PW

R

CO

M

+

-

+

-

CO

M

SH

L

D

SA/FC BUS

OC

OM

 1

6

OU

T

 1

OC

OM

 1

OU

T

 2

OC

OM

 2

OU

T

 3

OC

OM

 3

OU

T

 4

OC

OM

 4

OU

T

 5

OC

OM

 5

OU

T

 6

OC

OM

 6

OU

T

 7

OC

OM

 7

OU

T

 8

RELAY OUTPUT

OC

OM

8

FC EOL

IN

 

 

-

+

-

+

-

+

-

+

-

+

-

+

-

+

-

+

 

 

 

 

 

 

 

 

 

 

 

 

 

-

+

-

+

-

+

-

+

+

-

+

-

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Table 4: 

IOM5731 point to point wiring diagram               

 (Part 1 of 2)

No

Description

Object Name

JCI part 
no

1

Boiler 1 isolation valve 
command

BLR1-ISO-C

Relay 
contact

2

Boiler 2 isolation valve 
command

BLR2-ISO-C

Relay 
contact

3

Boiler 3 isolation valve 
command

BLR3-ISO-C

Relay 
contact

4

Boiler 4 isolation valve 
command

BLR4-ISO-C

Relay 
contact

5

Secondary hot water pump 
1 command

SHWP1-C

RIBU1C

6

Secondary hot water pump 
2 command

SHWP2-C

RIBU1C

7

Secondary hot water pump 
3 command

SHWP3-C

RIBU1C

8

Secondary hot water pump 
4 command

SHWP4-C

RIBU1C

9

To next SA device

10

From last SA device

11

Bypass valve output (to 
pump VFD)

BYP-O

12

Hot water mixing valve 
output (to pump VFD)

HWMIX-O

Valve

13

Boiler or boiler-setpoint 4 
output (to pump VFD)

BLR4-O/
BLR4SP-O

VFD

14

Boiler or boiler-setpoint 3 
output (to pump VFD)

BLR3-O/
BLR3SP-O

VFD

15

Boiler or boiler-setpoint 2 
output (to pump VFD)

BLR2-O/
BLR2SP-O

VFD

16

Boiler or boiler-setpoint 1 
output (to pump VFD)

BLR1-O/
BLR1SP-O

VFD

Table 4: 

IOM5731 point to point wiring diagram                
(Continued) (Part 2 of 2)

No

Description

Object Name

JCI part 
no

Figure 8:  IOM5731 point to point wiring diagram

Summary of Contents for LC-VAC3000-0

Page 1: ...or more information or to access Quicklit scan the following QR codes Mounting the controller To mount the controller complete the following steps 1 Mount a 20 cm 8 in section of 35 mm 1 3in DIN rail...

Page 2: ...ight of the controller Wire the 24 VAC supply power wires from the transformer to the HOT and COM terminals on the terminal plug as shown in Figure 6 Note Do not use the middle terminal on the supply...

Page 3: ...PUT COM VAC3000 OUT1 OCOM1 OUT2 OCOM2 OUT3 OCOM3 24V COM 24 VAC OUT IN 18 ICOM 18 15V COM MOD BUS COM OCOM4 OUT4 PWM COM OUT5 PWM PWM OUT6NO OCOM6 OUT7NO OCOM7 OUT8NO OCOM8 OUT9NO OCOM9 OUT11 A OUT11...

Page 4: ...s BLR4 A 29 Boiler pump 1 status BP1 S 30 Boiler pump 2 status BP2 S 31 Boiler pump 3 status BP3 S 32 Boiler pump 4 status BP4 S 33 Secondary hot water pump 1 status SHWP1 S 34 Secondary hot water pum...

Page 5: ...y contact 3 Boiler 3 isolation valve command BLR3 ISO C Relay contact 4 Boiler 4 isolation valve command BLR4 ISO C Relay contact 5 Secondary hot water pump 1 command SHWP1 C RIBU1C 6 Secondary hot wa...

Page 6: ...umps Sets the number of primary pumps Adjustable 1 4 Primary Pump Operation Type Sets the pumps operation type Adjustable Duty Standby Lead Lag Number of Secondary Pumps Sets the number of secondary p...

Page 7: ...trols declares that this product is also in compliance with the essential requirements and other relevant provisions of the EMC Directive Declared as Electronic Independently mounted control suitable...

Reviews: