Verasys Boiler Controller Quick Start Guide
Refer to the
for the most up-to-date version of this document.
1
Verasys Boiler Controller
Quick Start Guide
LC-VAC3000-0
Code No. Lit 12013353
Issued June 2019
Figure 1: LC-VAC3000-0
About this guide
This quick start guide provides the basic information you need to
configure and install the Boiler Controller and application.
For further information, refer to the
Verasys® 32 Point 24 VAC
Application Controller Installation Instructions (24-10143-01515)
, and
Verasys Boiler Controller Application Not
e (LIT-12013275) on
QuickLit.
For more information or to access Quicklit, scan the following QR
codes:
Mounting the controller
To mount the controller, complete the following steps:
1.
Mount a 20 cm (8 in.) section of 35 mm (1.3 in.) DIN rail
horizontally.
Note:
Mount the controller in the horizontal position.
2.
On the back of the controller, extend the two mounting clips as
shown in the following figure.
3.
Place the controller on the DIN rail.
4.
To secure the controller on the DIN rail, push the bottom
mounting clips up as shown in the following figure.
5.
To remove the controller from the DIN rail, pull the bottom
mounting clips out to the extended position and carefully lift the
controller off the DIN rail
LC-VAC3000-0 QR code
QuickLit QR code
Figure 2:
Pull lower mounting clips down
Figure 3:
Pull lower mounting clips down