SUPERCEDES
TITLE
DATE
SECTION
CINCINNATI, OHIO
MFG., INC.
900530b
C200
5-26-06C
5-27-06D
INSTALLATION DWG
CONTROL FUNCTIONS
WINCH "UP" and "DOWN" - Raises and lowers the load with the wire rope.
POWER ELEVATION - "Up" raises the boom elevation by operating the valves and the
electric hydraulic power unit. "Down" operates a solenoid release valve mounted on the
cylinder to lower the load and/or boom by gravity at a controlled rate. A check valve on the
cylinder prevents the boom from coming down if a hose breaks. A flow control valve controls
lowering rate.
POWER EXTENSION - "Out" and "In" extend and retract boom 4 ft. under power. A pilot
operated check valve on the boom prevents the boom retracting without hydraulic power or if a
hose should break. A flow control valve controls retract rate under load.
POWER ROTATION - "L" & "R" control direction of rotation. The ET8KX, ET10KX or ET12KX
can be rotated continuously thru 360 degrees or more. There are no internal restrictions on the
number of rotations in any direction.
CONTROL PRIORITY SYSTEM - As a built in safety feature, the operator can perform only one
major and one minor function at any one time. Major functions are rotation, winching up of a
load, and elevating, extending and retracting the boom. Minor functions are winching down,
and lowering the boom.
a. "Winch Up" has priority over "Boom Up", "Boom Out & In", and "Rotation"
b. "Boom Up" has priority over "Boom Out & In", and "Rotation".
c. "Boom Out & In" have priority over "Rotation".
d. "Boom Down" and "Winch Down" can be operated with any function.
CRANE OPERATION
Avoid rapid reversal of the Winch and Rotation Control Switches. The high inrush current to
the motors during reversal can reduce the life of the contactors and the motor brushes and
commutators.
When operating "Winch Up", "Boom Down" or "Boom Out" always maintain clearance
between the boom head and the snatch block or hook.
Do not lift or drag a load sideways using any of the crane functions. The boom has much lower
bending strength sideways than in the vertical direction.
ET8/10/12K(X)
Summary of Contents for ET8K
Page 1: ......
Page 2: ......
Page 4: ......
Page 5: ...SECTION 100 DESCRIPTION SPECIFICATIONS 7607100A ...
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ...SECTION 150 SAFETY 8604150 ...
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ...SECTION 200 INSTALLATION 7607200A ...
Page 26: ......
Page 27: ......
Page 32: ......
Page 33: ...SECTION 300 MAINTENANCE SERVICE 7607300A ...
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ...SECTION 400 PARTS 7607400A ...
Page 38: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......