Luminaire Installa on
1.
Open shell referring to diagram overleaf.
2.
Pass luminaire power cable through strain relief
gland and connect to top power terminal.
3.
Connect ba ery to PCB header.
4.
Snap pod casing onto hanger.
5.
Light source can be mounted on compa ble Venture luminaire or
reflector with supplied brackets.
Power In
To Luminaire
Reflector Moun ng
Luminaire Moun ng
Self‐Test
During self –test the light source will illuminate and the red indi‐
cator LED will flash con nuously. On comple on the pod returns
to normal opera on.
Schedule
Every month ‐ 10 minute self‐test.
Annually ‐ 3 hours self‐test.
LED Status Indicator
Green
Normal opera on
Single red flash
Ba ery failure or not connected
Double red flash
Light source failure
Triple red flash
3Hr self test failed. Ba ery at end of life
Document Revision 2
09/08/2019
Switched Live (Black)
Live (Brown)
Neutral (Blue)
(Green/Yellow)
Switched Live
Neutral
Manual Test
A er installa on emergency func‐
on can be checked by pressing
the test bu on for 3 seconds. The
light will illuminate for 5 minutes
before resuming normal opera on.
Timer Reset
Monthly and annual mers can be
reset by pressing the test bu on
for 1s.