background image

Luminaire Installa on 

1. 

Open shell referring to diagram overleaf. 

2. 

Pass luminaire power cable through strain relief  
gland and connect to top power terminal. 

3. 

Connect ba ery to PCB header. 

4. 

Snap pod casing onto hanger. 

5. 

Light source can be mounted on compa ble Venture luminaire or 
reflector with supplied brackets. 

 

 

Power In 

To Luminaire 

         Reflector Moun ng   

 

 

 

                  Luminaire Moun ng 

 

 

Self‐Test 

During self –test the light source will illuminate and the red indi‐
cator LED will flash con nuously. On comple on the pod returns 
to normal opera on.  

Schedule 

Every month  ‐  10 minute self‐test. 

Annually  ‐  3 hours self‐test. 

LED Status Indicator 

Green   

 

Normal opera on 

Single red flash 

Ba ery failure or not connected 

Double red flash 

Light source failure 

Triple red flash 

3Hr self test failed. Ba ery at end of life 

 

Document Revision 2 

09/08/2019 

Switched Live (Black) 
Live (Brown) 
Neutral (Blue) 
      (Green/Yellow) 

Switched Live  
Neutral  
 

Manual Test 

A er installa on emergency func‐

on can be checked by pressing 

the test bu on for 3 seconds. The 
light will illuminate for 5 minutes 
before resuming normal opera on. 

 

Timer Reset 

Monthly and annual  mers can be 
reset by pressing the test bu on 
for 1s. 

Reviews: