VUT 160/250/350 PB EC L/R A11/A14

www.ventilation-system.com

3. Fan maintenance (once per year).

Even in case of regular maintenance of the filters, some dust may accumulate inside the fans and reduce the fan performance and supply 
air flow.  Clean the fans with a soft brush or cloth. Do not use water, aggressive solvents, or sharp objects as they may damage the impeller.

4. Technical maintenance of condensate drainage system (once a year).

The condensate drainage (drain line) may get clogged by dirt and dust particles contained in the exhaust air. Pour some water inside the 
drain pan to check the pipe for clogging. Clean the U-trap and the drain pipe if required.

5. Ductwork system maintenance (once in 5 years).

Even regular fulfilling of all the maintenance operations prescribed above may not completely prevent dirt accumulation in the air ducts, 
which leads to air pollution and reduces the unit capacity. Duct maintenance means regular cleaning or replacement.

6. Control unit maintenance (if necessary).

The control unit is positioned inside the unit casing. For accessing the control unit remove the fixing screws on the service panel and 
remove it.

CAUTION!  The control unit maintenance must be performed by an expert qualified for unassisted operations with electrical 

installations with the voltage up to 1000 V after careful reading of the user’s manual.

TROUBLESHOOTING

Problem

Possible reasons

Troubleshooting

The fan(s) do(es) not get 
started.

No power supply.

Make sure the power supply line is connected 
correctly, otherwise troubleshoot a connection 
error.

Low air flow.

Filters, fans or the heat exchanger are soiled.

Clean or replace the filters, clean the fans, and the 
heat exchanger.

The ventilation system is soiled or damaged.

Make sure the air ducts are clean and intact. 

Noise, vibration.

The fan impeller is soiled.

Clean the impellers.

Fan screw connection is loose.

Check tightening torques. 

Water leakage.

The drainage system is soiled, damaged, or 
installed incorrectly. 

Clean the drain line if necessary. Check the drain 
line slope angle. Make sure that the U-trap is filled 
with water and the drain pipes are frost protected.

•  Store the unit in the manufacturer’s original packaging box in a dry closed ventilated premise with temperature range 

from +5 ˚С  to +40 ˚С  and relative humidity up to 70 %.

•  Storage environment must not contain aggressive vapors and chemical mixtures provoking corrosion, insulation, and sealing 

deformation.

•  Use suitable hoist machinery for handling and storage operations to prevent possible damage to the unit.
•  Follow the handling requirements applicable for the particular type of cargo.
•  The unit can be carried in the original packaging by any mode of transport provided proper protection against precipitation and 

mechanical damage. The unit must be transported only in the working position.

•  Avoid sharp blows, scratches, or rough handling during loading and unloading.
•  Prior to the initial power-up after transportation at low temperatures allow the unit to warm up at operation temperature for at least 

3-4 hours.

STORAGE AND TRANSPORTATION REGULATIONS

Summary of Contents for VUT 160 PB EC L A11

Page 1: ...250 PB EC L A11 VUT 250 PB EC R A11 VUT 350 PB EC L A11 VUT 350 PB EC R A11 VUT 160 PB EC L A14 VUT 160 PB EC R A14 VUT 250 PB EC L A14 VUT 250 PB EC R A14 VUT 350 PB EC L A14 VUT 350 PB EC R A14 Hea...

Page 2: ...theoretical and practical training in the field of ventilation systems and should be able to work in accordance with workplace safety rules as well as construction norms and standards applicable in th...

Page 3: ...r mains prior to any technical maintenance Do not store any explosive or highly flammable substances in close proximity to the unit When the unit generates unusual sounds odour or emits smoke disconne...

Page 4: ...ed from the premises to warm up the filtered stream of supply air The unit is not intended for organizing ventilation in swimming pools saunas greenhouses summer gardens and other spaces with high hum...

Page 5: ...rom 82 up to 94 from 80 up to 98 from 80 up to 91 Heat exchanger type counter flow Heat exchanger material aluminium The unit is designed for indoor application with the ambient temperature ranging fr...

Page 6: ...L3 L3 L5 L L2 L4 A view outdoor connection B view indoor connection L4 L2 L1 L6 L3 Model Dimensions mm D A A1 A2 B B1 B2 B3 H H1 L L1 L2 L3 L4 L5 L6 VUT 160 PB EC L R A11 A14 125 1008 1105 1073 754 8...

Page 7: ...EC L R A11 unit assembly Control panel Detachable service plates for filter maintenance operations Service side Outdoor temperature sensor Supply air temperature sensor Supply fan Extract fan Control...

Page 8: ...d is removed outside through the drain pipes At the request of the customer the unit can be equipped with an HV2 humidity sensor The humidity sensor is purchased separately as an accessory The unit wi...

Page 9: ...minimizes heat losses which reduces the cost of space heating in the cold season EXTRACT AIR SUPPLY AIR INTAKE AIR EXHAUST AIR Defrosting mode to prevent the heat exchanger freezing in the cold season...

Page 10: ...ract air duct and connect the humidity sensor connector to the respective contact socket coming from the control unit NKP HEATER MOUNTING IN VUT 160 250 350 P 2 B EC L R A11 UNITS The NKP heater is no...

Page 11: ...ots on both sides of the unit while mounting Minimum straight air duct length equal to 1 air duct diameter on the intake side equal to 3 air duct diameters on the outlet side If the air ducts are too...

Page 12: ...ly CONDENSATE DRAINAGE Connect the drain pipe to the sewage system using the SG 32 U trap kit available upon separate order The pipe slope downwards must be at least 3 min 3 min 3 Drain hose U trap Se...

Page 13: ...ed 2 A 230 V When connecting the supply and or exhaust air dampers to the contacts 4 and 5 of the external connection terminals electric voltage 230 V 50 60 Hz is supplied to the above terminals when...

Page 14: ...ocket located on the side panel of the control unit from the side of the extract pipe in accordance with the External wiring diagram Connection of outer air dampers SM1 supply air damper SM2 exhaust a...

Page 15: ...the filters and the detachable plates in the reverse order 2 Heat exchanger maintenance once per year Some dust may accumulate on the heat exchanger even in case of regular maintenance of the filters...

Page 16: ...started No power supply Make sure the power supply line is connected correctly otherwise troubleshoot a connection error Low air flow Filters fans or the heat exchanger are soiled Clean or replace th...

Page 17: ...e user s manual with the purchase date stamp and the payment paperwork certifying the purchase The unit model must comply with the one stated in the user s manual Contact the Seller for warranty servi...

Page 18: ...18 VUT 160 250 350 PB EC L R A11 A14 www ventilation system com...

Page 19: ...he user s manual The warranty terms are acknowledged and accepted Customer s Signature TheVUT ______ PB EC __ A___ unit has been connected to power mains pursuant to the requirements stated in the pre...

Page 20: ...V108EN 03...

Reviews: