www.ventilation-system.com
10
CONDENSATE DRAINAGE
The unit is equipped with drain pans designed to remove condensate formed in the process of heat exchangers operation.
Connect the drain pipes, the U-traps and the sewage system with plastic or rubber pipes for condensate disposal arrangement. The pipe
slope downwards must be at least 3°.
Before starting the unit fi ll the system with water and check that the U-trap is always fi lled with water. Check for any obstructions to the
free fl ow of water into the sewage system to prevent condensate accumulation inside the unit, which may cause equipment failure and water
ingress into the premises.
min 3°
Condensate
drain pipe
Pipe
U-trap
Sewage
system
Pipe
Install the unit on the mounting brackets. Tighten the three-sided thumbscrews on the mounting brackets.
Те
рмос
та
т
Средняя скорос
ть
Низк
ая скорос
ть
Режим
ожидания
Дв
ух
прово
дной
пу
ль
т (NO)
1
2
91
0
11
Те
рмос
та
т
Средняя скорос
ть
Низк
ая скорос
ть
Режим
ожидания
Дв
ухпрово
дной
пу
ль
т (NO)
1
2
91
0
11
Те
рмос
та
т
Средняя скорос
ть
Низк
ая скорос
ть
Режим
ожидания
Дв
ухпрово
дной
пу
ль
т (NO)
1
2
91
0
11
Summary of Contents for VUE2 200 P
Page 18: ...V87EN 03...