![Ventis HE200 Installation And Operation Manual Download Page 59](http://html.mh-extra.com/html/ventis/he200/he200_installation-and-operation-manual_1002228059.webp)
HE200 - Installation and Operation Manual
59
Interior
offset
installation
Connection
to
a
masonry
chimney
1.
Cut
and
frame
the
holes
in
the
ceiling,
floor
and
roof
where
the
chimney
will
pass.
Use
a
plumb
bob
to
line
up
the
center
of
the
holes.
Make
sure
that
the
size
of
the
floor
and
ceiling
holes
are
in
accordance
with
the
chimney
manufacturer’s
instructions.
2.
From
below,
install
a
firestop
(A)
supplied
by
the
chimney
manufacturer
in
each
ceiling/floor
separation
through
which
the
chimney
will
pass.
At
the
attic
level,
install
a
radiation
shield
from
above
(C).
3.
Follow
the
chimney’s
manufacturers’
instructions
and
place
the
first
chimney
length
on
the
fireplace.
For
all
chimneys,
you
must
use
an
anchor
plate
(A)
supplied
by
the
chimney
manufacturer
before
installing
the
first
chimney
length.
Continue
installing
chimney
lengths
making
sure
to
lock
each
length
in
place.
Summary of Contents for HE200
Page 9: ...HE200 Installation and Operation Manual 9 ...
Page 38: ...38 HE200 Installation and Operation Manual ...
Page 45: ...HE200 Installation and Operation Manual 45 INSTALLATION WITHOUT SHELF ...
Page 58: ...58 HE200 Installation and Operation Manual Direct installation Exterior offset installation ...
Page 93: ...HE200 Installation and Operation Manual 93 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST ...