6
Electrcal
Control Box
(
Colour: Yellow
)
Intake from
Outside
(
Colour: Green
)
SUPPLY
(
Warm Fresh Air
)
to the
Dwelling
(
Colour: Red)
from the Dwelling
EXTRACT
(
Warm Stale Air
)
(
Colour: Orange
)
to Outside
SUPPLY
(
Cold Fresh Air
)
DISCHARGE
(
Cold Stale Air
)
E.
CONDENSATE DRAIN.
Installation.
1.
Remove the quarter turn Drain Plug seal
(item1) shown and insert the quarter turn
Drain Elbow (
Item 3),
connect the Tubing
(
Item 2)
to the Drain Elbow and secure with
a Clip Band. Align the Drain Elbow with the
waste pipe to ensure there are no abrupt
bends or restrictions in the Tubing.
Note:
Ensure that units are installed with a 5° fall
towards the condensate drain point.
2.
Connect the tubing (
Item 2
) to Drain
Elbow and secure into position with
a Clip Band. Align the elbow with the
condensate waste pipe to ensure
there are no abrupt bends or
restrictions in the Tubing.
3.
Install the condensate drainage
Tubing in accordance with the
diagram.
4.
Ensure the water trap is below the
Drain Elbow outlet ‘
A
’.
CLIP BAND
SILICON SEALER
WATER TRAP
FALL TOWARDS
THE BUILDINGS
DRAINAGE SYSTEM
A
DRAIN
ELBOW
Site for
fitting of
drain elbow
Electrical control box
View inside base housing for loft mounting
Electrical control
box aperture
View inside top housing for ceiling mounting
Site for fitting
of drain elbow