![venotec Abyzz A200 Operating Manual Download Page 24](http://html1.mh-extra.com/html/venotec/abyzz-a200/abyzz-a200_operating-manual_864826024.webp)
!
!
Fig. 10:
O-ring position and assembly
Carefully place the impeller into the motor block and press the assembly into the
bearing seat until the bearing bracket is flush with the flange.
Screw the pump head back onto the motor block. The screws must be tightened
crosswise
to create even pressure on the O-ring seal and to ensure
impermeability.
In systems that are constantly and intensively subjected to limescale (e.g. hard
coral ponds), the pump must be regularly descaled.
!
24
EN
G
LI
SH
Summary of Contents for Abyzz A200
Page 1: ... Operating Manual A200 A200 AS A400 IPX 200 400 1 ...
Page 18: ... Fig 4 Overview of messages 18 ENGLISH ...
Page 20: ... Fig 4 Pump with pump head A200 20 ENGLISH ...
Page 21: ... Fig 6a Loosening of impeller components Fig 6b Disassembly of impeller components 21 ...
Page 30: ... Dimensions and weight Fig 11a b Dimensions pump A200 30 ENGLISH ...
Page 31: ... 31 ...
Page 32: ... Fig 11c d Dimensions pump A400 32 ENGLISH ...
Page 33: ... All dimensions in millimeter mm 33 ...
Page 36: ... Fig 14 Flow chart 200W models 36 ENGLISH ...
Page 37: ... Fig 15 Flow chart 400W models 37 ...
Page 39: ... 39 ...
Page 40: ... 40 ENGLISH ...