G-10
06/2005
VEND CYCLE
Several operations take place during the vend cycle: When a selection is made, the
coupler and bucket rotate, product is dispensed and the bucket is then reloaded.
The sequence of these operations change slightly when the column’s depth setting
is changed. With the single depth setting, one purchase is made and the bucket is
reloaded. With the double depth setting, two purchases are made before the bucket is
reloaded. With the triple depth setting, three purchases are made before the bucket is
reloaded. With the quadruple depth setting, four purchases are made before the bucket
is reloaded. (See Figures 8 & 9)
FIGURE 8
Summary of Contents for V21 621
Page 1: ...G 1 06 2005 GENERAL INFORMATION SECTION...
Page 9: ...G 9 06 2005 FIGURE 7...
Page 11: ...G 11 06 2005 FIGURE 9...
Page 12: ...G 12 06 2005 NOTES...