TITLE
SECTION
SUPERCEDES
DATE
416140
H300
2-1-94
9-15-97
FILLING HYD. RESERV.
VP/VC6(R) - VC520
INSTRUCTIONS FOR FILLING THE RESERVOIR OF
ELECTRIC HYDRAULIC POWER UNITS
THE FOLLOWING HOIST MODELS ARE INCLUDED:
VP/VC-6(R), VC-416/516, VC-520 - ES & ED
PROCEDURE
STEP 1 - On 416, 516, 520 ES models only, do not attach rod
end hose to the cylinder until after completing Steps 2
thru 6.
STEP 2 - Remove the reservoir breather. With the hoist in the
down position, fill the reservoir with ATF-Dextron II
(Mobile DTE 13 or equivalent) - 3.5 qts. for 416, 516,
520 and 2 qts. for VP-6(R).
STEP3 - Raise the hoist halfway (22-25° dump angle,
approx. 8" of cylinder stroke).
STEP 4 - Fill the reservoir with an additional 2 qts. for VP-6(R),
416, 516 and 3 qts. for 520.
STEP 5 - Raise the hoist completely.
STEP 6 - Refill the reservoir with the remaining fluid required.
STEP 7 - Attach hose to rod end of cylinder on the 416, 516,
520 ES models.
MODEL NO.
RESERVOIR CAPACITY
TOTAL
FLUID REQ'D
VP/VC-6(R) ED
2 QTS.
3.5 QTS
VC-416 ES/ED
4 QTS.
5.5 QTS
VC-516 ES/ED
4 QTS.
7.5 QTS
VC-520 ES/ED
4 QTS.
9.0 QTS.
Example: VC-416 ES/ED Hoist
Step 2 -
Add 3.5 qts.
Step 3 -
Add 2.0 qts.
Step 4 -
Add 0.0 qts (none req'd)
= 5.5 qts. total