Installation, Operating and Maintenance Instructions (Translation)
English
.
VEM motors GmbH-2013
3
Content
1.
General
1.1
Qualified personnel
1.2
Intended use
1.3
Check after delivery
1.4
Disclaimer
1.5
Used units
2.
General description
2.1
Motor design
2.2
Bearing
2.3
Cooling system
2.4
Monitoring devices
2.5
Identification of motor
3.
Efficiency
4.
Degree of Protection
5.
Type of Construction
6.
Transport, Storage and Packing
7.
Installation and Fitting
7.1
General remarks
7.2
Removal of the Transport Safety Device
7.3
Deconservation
7.4
Completion of motor
7.5
Mounting the coupling
7.6
Steel foundations
7.7
Concrete foundations
7.7.1 Concrete foundation with foundation blocks
7.7.2 Concrete foundation with base plate or base frame / with stone bolts
7.7.3 Concrete foundation with base plate or base frame / with anchor bolts
7.7.4 Concrete foundation with base plate or base frame / with T-head bolts
8.
Fastening, exact alignment
9.
Insulation Check
10.
Motor connection
10.1
Electric connection for low-voltage (up to 1,000 V)
10.2
Electric connection for high-voltage (2.2 kV up to 11 kV)
10.3
Direction of rotation
11.
Commissioning
12.
Maintenance
12.1
Initial inspection
12.2
Main inspection
12.3
Bearings and Lubrication
12.4
Condensate drain
12.5
Cleaning
13.
Long term storage (more than 12 months)
14.
Additional devices (optional)
14.1
Thermal motor protection
14.2
Anti-condensation heating
14.3
Forced ventilation unit
15.
Electromagnetic Compatibility
16.
Trouble Shooting
17.
Disposal
18.
Warranty, Repair, Spare Parts
19.
Terminal board connections / connection diagrams
20.
Design of terminal box
20.1
Design of terminal box for low-voltage applications
20.2
Design of terminal box for high-voltage applications
21.
Overview of spare parts
22.
Trouble shooting
22.1
Electrical Faults
22.2
Mechanical Faults
23.
EC declaration of conformity for low voltage motors and generators
24.
Declaration of incorporation of partly completed machinery