background image

5.2 Mounting method 

  An illustration of the installation is shown in Figure 5-2 

 

3 5mm wide DIN slot

Press back the DIN slot snap

IN

0UT

PWR RUN ERR

00

01

02

03

04

05

06

07

10

11

12

13

14

15

16

17

00

01

02

03

04

05

06

07

10

11

12

13

14

15

VC1-1614MAR

VEICHI

R UN

E RR

VC-4PT

VEICHI

24
V
R

1

+
R

1

-

I

1

-

I

1

+

C

OM

R

2

+
R

2

-

I

2

-

I

2

+

R

3

+
R

3

-

I

3

-

I

3

+

R

4

+
R

4

-

I

4

-

I

4

+

 

                                                                                    Figure 5-2 Module installation 

6 Operational check 

6.1    Routine check 

        1. Check that the analogue input wiring meets the requirements (refer to 1.5 Wiring instructions). 

        2. Check that the VC-4PT expansion module is reliably plugged into the expansion connector. 

        3. Check that the 5V power supply is not overloaded. Note: The power supply for the digital part of the VC-4PT comes from                 

the main module and is provided via the expansion interface. 

        4. Check the application to ensure that the correct operating method and parameter range has been selected for the application. 

        5. Set the VC1 main module to which the module is connected to a RUN state. 

6.2    Fault check 

If the VC-4PT does not operate properly, check the following items. 

● Check the status of the main module "ERR" indicator. 

Blinking: check whether the expansion module is connected and whether the configuration model of the special module is the same 

as the actual connected module model. 

extinguished: the expansion interface is correctly connected. 

● Check the analog wiring. 

Check that the wiring is accurate, refer to Figure 1-5. 

Check the status of the module's "ERR" indicator 

If the 24Vdc power supply is normal, then the VC-4PT is faulty. 

Off: 24Vdc power supply is normal. 

Check the status of the "RUN" indicator 

Blinking: The VC-4PT is operating normally. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for VC-4PT

Page 1: ...nual and carry out all operations of the equipment in accordance with the correct operating methods 1 Interface description 1 1 Interface description The expansion interface and user terminals of the VC 4PT are covered with flaps and the expansion interface and user terminals are exposed when each flap is opened The appearance and interface terminals are shown in Figure 1 1 RUN ERR VC 4PT VEICHI 2...

Page 2: ...for channel 4 RTD signal 18 I4 Channel 4 RTD signal auxiliary negative input Figure 1 3 Terminal definition table 1 4 Access system The expansion interface allows the VC 4PT to be connected to a main module of the VC series PLC or to other expansion modules The expansion interface can also be used to connect other expansion modules of the same or different models of the VC series This is shown in ...

Page 3: ...age 2 50mA from mains module or external power supply Digital Circuit 5Vdc 70mA from the main module 2 2 Performance indicators Table 2 2 Performance indicators Project Indicator Celsius C Fahrenheit F Input signal RTD type Pt100 Cu100 Cu50 Number of channels 4 Conversion speed 15 2 ms 4 channels unused channels are not converted Rated temperature range Pt100 150 600 Pt100 238 F 1112 F Cu100 30 12...

Page 4: ...lues of each channel 4 If the VC 4PT measurement value is 5 C 41 F higher in actual use the error can be eliminated by setting the two points P0 0 50 and P1 6000 5950 of the characteristic adjustment see Figure 3 3 for an example Figure 3 3 Example of characteristic change 4 Programming example 4 1 Programming example for VC series VC 4PT module As shown in the example below the VC 4PT is connecte...

Page 5: ...the 4PT module to enter the 4PT setup screen as shown below Figure 4 1 First channel setup 3 Click on for the second channel mode configuration Figure 4 2 Second channel setup 4 Click on to configure the third channel mode and click on Confirm when finished ...

Page 6: ...Receive the average conversion result with data registers D1 D2 and D3 The changes are shown in Figure 4 4 Note that the characteristic changes are all in degrees Celsius The range for setting the change value is within 1000 100 C Figure 4 4 Channel characteristics change setting 5 Installation 5 1 Installation size 9 1 7 3 2 9 0 9 9 2 4 0 R U N E R R V C 4 P T V E I C H I 2 4 V R 1 R I I 1 I 1 C ...

Page 7: ...e main module and is provided via the expansion interface 4 Check the application to ensure that the correct operating method and parameter range has been selected for the application 5 Set the VC1 main module to which the module is connected to a RUN state 6 2 Fault check If the VC 4PT does not operate properly check the following items Check the status of the main module ERR indicator Blinking c...

Page 8: ...be calculated on the basis of the actual cost and if there is another contract the contract will take precedence 6 Please make sure that you keep this card and present it to the service unit at the time of warranty 7 If you have a problem you can contact your agent or you can contact us directly Suzhou VEICHI Electric Technology Co Ltd China Customer Service Center Address No 1000 Songjia Road Wuz...

Reviews: