![Vega VEGACAP 65 Operating Instructions Manual Download Page 20](http://html1.mh-extra.com/html/vega/vegacap-65/vegacap-65_operating-instructions-manual_3882850020.webp)
20
5 Connecting to power supply
VEGACAP 65 • Two-wire
30019-EN-230510
5.4 Wiring plan - version IP66/IP68, 1 bar
1
2
Fig. 12: Wire assignment, connection cable
1 Brown (+) and blue (-) to power supply or to the processing system
2 Shielding
5.5 Warm-up reaction
After connecting to voltage supply or after a voltage recurrence, the
instrument passes a certain switch on routine.
By lowering the current value when switching on, the instrument can
output briefly a fault signal.
10
I/mA
20,5
< 2,3
1,5
3
4,5
t/s
1
Fig. 13: Warm-up reaction
1 Measured value
Wire assignment, con-
nection cable