
19
4 Mounting
VEGABAR 83 • Modbus and Levelmaster protocol
46295-EN-131107
3
1
2
Fig. 11: Measurement setup for process pressure measurement of liquids in
pipelines
1 VEGABAR 83
2 Blocking valve
3 Pipeline
4.4 Level measurement
Keep the following in mind when setting up the measuring system:
•
Mount the instrument below the min. level
•
Do not mount the instrument close to the filling stream or emptying
area
•
Mount the instrument so that it is protected against pressure
shocks from the stirrer
Fig. 12: Measurement setup for level measurement
Measurement setup