K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-35
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
7. Remove the tee fitting assembly (see Figure 5-105) from each copper electrode. Using the socket
adapter and 1-5/16 socket, carefully loosen and remove all six (6) of the brass nuts, in a criss-cross
pattern.
Note:
Lift the heater assembly slowly and carefully (two people) to prevent damage to
parts.
8. Raise the heater assembly from the holes of the electrode bushings and baseplate water lines (see
Figure 5-106) on the reactor cart frame, and place it on a clean, flat surface.
Figure 5-32. Heater Baseplate Assembly