2. OPERATION PROCEDURE
TO M-14P MS
TASK CARD No. 201
M S ITEM
PROCEDURE
'. Removal
OPERATIONS AND TECHNICAL REQUIREMENTS
CORRECTIVE
ACTIONS
CH
ECKED BY
1, Unlock and undo the attachment nut of the governor control roller and remove the
roller.
2. Undo four governor attachment nuts. 3. Remove four flat and four split washers. 4.
Remove the governor from the engine. 5. Remove the gaake t.
6. Install the governor on the support and secure it to the latter by shipping bolts.
TEST EQUIPMENT
TOOLS AND FIXTURES
MATERIALS
Pliers, flat-nosed 150 Screwdriver 700345
A150x0.5 Wrench 11x14 14-24-861 Wrench 9x11
700002
Summary of Contents for M-14P
Page 6: ...19 Engine M 14P Front View Figure 1...
Page 7: ...20 Engine M 14P Rear View Figure 2...
Page 27: ...40 Arrangement of Airborne Tools in Case Figure 1...
Page 39: ......
Page 44: ...57 Engine M 14P Test Run Chart Figure 201...
Page 67: ...80...
Page 163: ...176 Crankshaft Thrust Ball Bearing Front Cover Figure 1 Intermediate Crankcase Figure 2...
Page 166: ...179 Intermediate Grankcase Front Portion Figure 3 Intermediate Crankcase Rear Portion Figure 4...
Page 173: ...186 Front view Cylinder Figure 1 Rear view...
Page 180: ...193 Timing Mechanism Schematic Diagram Figure 6 Cam Plate Figure 7...
Page 189: ...Blower Longitudinal Section View Figure 1...
Page 191: ...Rear view Mixture Collector Figure 2 Diffuser Figure 3...
Page 194: ...1 Plate 2 Spring 3 Plate 4 Gear 5 Accessory Drive Shaft Blower Coupling Figure 4...
Page 204: ...Oil Sump Figure 4...
Page 216: ...Engine M 14P Gear Train Figure 1...
Page 247: ...Carburetor AK 14P Operation Diagram Figure 1...
Page 249: ......
Page 274: ......
Page 282: ......
Page 283: ......
Page 288: ...T t en 0 CO 0 T K D fi h0 Ol f 01 3 0 F4...
Page 293: ......
Page 344: ...Generator Electrical Connection Diagram Commutator Side View Figure 3 1 Main Pole 2 Interpole...
Page 355: ......
Page 358: ......