background image

4

To Turn Machine On

Connect the propane/butane gas 
cartridge to the main body. Make sure it 
is locked into position. Turn the gas 
supply on by turning the valve counter 
clockwise, as shown in the diagram. To 
start the machine, press the ignition 
switch located on the left hand side of 
the machine. It is necessary to keep the 
machine on for about 10 seconds (if 
water fogging) and/or 30 seconds (if oil 
fogging) to warm up before opening the 
chemical valve.

To Start Fogging

Once the machine has warmed to the 
required temperature, turn the chemical 
valve counter clockwise as shown in the 
diagram below and press the trigger to 
start fogging. When the trigger is 
released, the fogging will pause.

Note: When oil fogging, please make sure 
the oil has been consumed. Any oil still left 
in the coil after use could cause it to block 
and not work on the next session.

To Turn Machine Off

Release the trigger. Turn the chemical 
supply valve clockwise to stop the 
supply of chemical. Turn off the gas 
supply by turning the valve clockwise as 
shown on the diagram below. Remove 
gas cartridge.

Note: When storing the machine, please 
make sure no dilutant or chemicals are 
left in the tanks.

Chemical Level
Indicator

Summary of Contents for BY100

Page 1: ...2021 Vectorfog is a registered trademark of Vectornate USA Inc BY100 Mini Fogger Manual...

Page 2: ...ment face breathing mask protective clothing gloves etc when handling potentially hazardous chemicals When fogging outdoors you should only fog for short periods at a time and when there is not much w...

Page 3: ...0 Kg 610x175x400 mm Model Dilutant Tank Water or Oil Chemical Tank Fogging Flow Rate Fuel Chemical Output Net Weight Gross Weight Dimensions Accessories 1 BY100 Mini Fogger 2 Plastic Pump 3 Shoulder S...

Page 4: ...clockwise direction Dilutant Tank Fill the Chemical Tank quimicos Pre mix chemical with an oil or water based emulsi er prior to lling the chemical tank Please refer to chemical manufacturers instruct...

Page 5: ...d to the required temperature turn the chemical valve counter clockwise as shown in the diagram below and press the trigger to start fogging When the trigger is released the fogging will pause Note Wh...

Page 6: ...Part No 1 1 1 2 Burner Net Set Burner Control Valve Set Part Name Part No 2 1 2 2 Jet Nozzle Coil Set 2 3 1 Coil Connecting Bolt 2 3 2 2 3 3 Ring 6mm Coil Nut 2 3 4 Pump Pipe 2 4 Pump Set Part Name...

Page 7: ...al Control Valve Set Chemical Tank Part Name Part No 4 1 1 4 1 2 Chemical Supply Pipe Ring 4mm 4 1 3 4 1 4 Chemical Supply Pipe Nut S Chemical Supply Pipe Nut B Part Name Part No 5 1 5 2 Insulator Ign...

Page 8: ...ndle 6 1 3 Pump Wire 6 1 4 6 1 5 Ball Pump Plastic 6 1 6 Pump Spring 6 1 7 Chemical Tank Lid 6 1 8 6 1 9 Chemical Control Handle Chemical Tank Cover 6 1 10 Cover Molding 6 2 6 3 Safety Net Fuel Tank 6...

Page 9: ...o a range between 4 10 at 200 PPM Using solutions out of the pH value 4 10 will make the warranty null and void After use fog with clean water for about 3 minutes to remove any chemicals still left in...

Page 10: ...www vectorfog com NL OFFICE KOREA OFFICE US OFFICE TEL NL 31 20 899 0992 KOREA 82 0 70 4694 2489 US 1 201 482 9835 EMAIL info vectorfog com...

Reviews: