54
GETTING TO KNOW YOUR ECS-9200/9100
©Vecow ECS-9200/9100 User Manual
2.6.2 Ignition Control Wiring
To activate ignition control, you need to provide IGN signal via the 3-pin
pluggable terminal block located in the back panel. It is below the general wiring
configuration.
For testing purpose, you can refer to the picture blow to simulate ignition signal
input controlled by a latching switch.
Note:
1. DC power source and IGN share the same ground.
2. ECS-9200/9100 supports 6V~36V wide range DC power input in ATX/AT
mode. In Ignition mode, the input voltage is fixed to 12V/24V for car battery
scenario.
3. For proper ignition control, the power button setting should be “Power down”
mode.
In Windows, for
example, you need
to set “When I press
the power button” to
"Shut down."
Pin No.
Definition
1
Ignition (IGN)
2
External Power S/W +
3
External Power S/W +
IGN
V+
Summary of Contents for ECS-9101
Page 68: ...61 HARDWARE INSTALLATION Step 4 Open CPU slot Be careful CPU pins Step 3 CPU slot...
Page 77: ...70 HARDWARE INSTALLATION Vecow ECS 9200 9100 User Manual Step 3 Finish Step 4 Install SSD HDD...
Page 78: ...71 HARDWARE INSTALLATION 3 9 Installing M 2 Step 2 Fasten one M3 screws Step 1 M 2 slot...
Page 82: ...75 HARDWARE INSTALLATION Step 2 Fasten 4pcs KHS 6 32 screws then finish...