3. Installing the Equipment
EzRay Air Wall (Model: VEX-S300W) Installation Manual
23
EN
G
L
ISH
3.1
Marking Drill points on the wall
1.
Prepare the spirit level.
2.
Attach the drilling template
(Single Stud: Part No.17
or
Double Stud: Part No.25)
temporally.
Place it on the wall and ensure leveling is obtained (the bubble should be located in
the middle of the spirit level).
3.
If it is, tape the drilling template temporally at three or four corners.
4.
Mark the holes on the wall according to the mounting type and then remove the drilling
template.
<Single Stud> <Double Stud>
Summary of Contents for EzRay Air Wall VEX-S300W
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 64: ...3 Installing the Equipment 54 EzRay Air Wall Model VEX S300W Installation Manual ...
Page 66: ...4 Product Specifications 56 EzRay Air Wall Model VEX S300W Installation Manual ...
Page 67: ...4 Product Specifications EzRay Air Wall Model VEX S300W Installation Manual 57 ENGLISH ...
Page 74: ...Appendix 64 EzRay Air Wall Model VEX S300W Installation Manual Double Stud ...
Page 79: ......
Page 80: ...Copyright VATECH Networks All Rights Reserved ...