![VAT 612 GC Series Installation, Operating, & Maintenance Instructions Download Page 8](http://html1.mh-extra.com/html/vat/612-gc-series/612-gc-series_installation-operating-and-maintenance-instructions_4051836008.webp)
Installation, Operating & Maintenance Instructions
Series 612 DN 40-50 (I.D. 1.5“ - 2”), Logic
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com
289419EB
2011-12-12
8/60
2 Installation
2.1 Unpacking
Valves DN63 / 2½" and larger must not be lifted solely by the actuator.
2.2 Installation into the system
Fingers and objects must be kept out of the valve opening and away from moving parts.
The valve plate may start to move just after power is supplied.
Do not connect or disconnect sensor cable when device is under power.
Connection
overview
Connectors
at
controller
panel
Ground
connection