INSTALLING MOUNTING POLES OR I-BEAMS

The following information for installing the mounting poles/

beams are suggestions only. Local codes, field placement, 

scoreboard options, customer preference, and other special 

considerations will determine the specifics of your installation, 

including footer specifications, above ground height, and total 

length of the poles/I-beams   

Consult with local building officials for the required pole sizes 

and footer construction regarding this installation. A local  

architect, structural engineer, or sign installer may also be a 

source of assistance. 

1 /

Install the t

wo

 (

2

) mounting poles/beams (supplied by the 

customer) on the field 1

2

’-0” (t

welve

 feet, zero inches) center to 

center with 18’-6”(

*

) of pole/beam above ground (refer to the 

installation diagram below). If a sponsor panel is to be mounted 

above the scoreboard, leave 21’-0” (

*

) of pole/beam above 

ground (an additional 31”). 

Remember: Keep boom and lines away from power lines to 

avoid shock or electrical burn

2 /

The poles / I-beams must be set into concrete footers. Make 

sure the poles are level and plumb and spaced on recommended 

1

2

’ centers. The mounting faces of poles/I-beams must be 

straight with each other.  

NOTE: IF THE POLES/I-BEAMS ARE NOT IN ALIGNMENT — SHIMS MAY 

BE NEEDED TO MOUNT THE SCOREBOARD PROPERLY. MOUNTING THE 

SCOREBOARD WITH THE POLES/I-BEAMS OUT OF ALIGNMENT MAY 

DAMAGE THE SCOREBOARD AND VOID THE WARRANTY. 

RE-USING OLD COLUMNS

If you plan to re-use old columns to install your scoreboard, 

please take measurements of your columns and call technical 

support at 800-411-3136 to discuss further instructions. 

18’ - 6” To 

Top of Beam/

Pole With No 

Sponsor Panels  

Depth 

Determined by 

Local Codes 

2

0

 4

8’

10’

Depth 

Determined by 

Local Codes 

1

2

1

2

’ 

I - BEAM  

1

2'

 @ Centerline  

PIPE  

1

2

’ @ Centerline  

6

"

Summary of Contents for 3320

Page 1: ...MODEL 3320 Installation Manual...

Page 2: ......

Page 3: ...aterials and workmanship for the period specified in the warranty from the date of invoice SERVICE Technical Support is available 24 hours a day 7 days a week 1 800 411 3136 https www varsityscoreboar...

Page 4: ...LLERS If you are installing this scoreboard for a client please return the manual to the individual in charge of the scoreboard upon completion of installation SCOREBOARD DIMENSIONS 8 0 tall x 20 0 wi...

Page 5: ...EL 3320 INSTALLATION 6 7 INSTALLATION OVERVIEW 8 PRODUCT SPECIFICATIONS 9 DETERMINING LOCATION AND ORIENTATION 10 18 INSTALLING MOUNTING POLES OR I BEAMS 10 18 MOUNTING THE SCOREBOARD 10 18 TESTING IN...

Page 6: ...eboard Shipped in 5 sections Please inspect all shipping containers upon arrival for damage and ensure that you have all of the parts listed below ITEMS IN LARGE PACKAGE S 2 Mounting Tools 20 mounting...

Page 7: ...hat aren t sighted for as damaged upon arrival The shipper is responsible for filing a claim unless shipped 3rd party 1 Note DAMAGED on the Delivery Receipt Form including details of the type of damag...

Page 8: ...tion applies to all Follow this guide as closely as possible to ensure proper installation 1 Review the product specifications below to determine your specific installation hardware 2 Determine the sc...

Page 9: ...ased on customer s local building codes soil conditions and wind loads Flat Stock mounting brackets and bolts are supplied Support structure and mounting hardware supplied by installer others POWER RE...

Page 10: ...ld the system be used to score a daytime or afternoon game The scoreboard should be positioned so that sunlight does not glare off its face In the U S placement on the South or West side of the field...

Page 11: ...If a sponsor panel is to be mounted above the scoreboard leave 21 0 of pole beam above ground an additional 31 Remember Keep boom and lines away from power lines to avoid shock or electrical burn 2 T...

Page 12: ...rd arrange the panels in order A E from RIGHT to LEFT face down with the top away from the mounting poles or I beams Keep the panels aligned at the top and against each other making sure not to pinch...

Page 13: ...slowly raise the scoreboard to level it and clamp to the other end mounting pole or I Beam 9 Weld or bolt the mounting angle to the poles or I Beams you are clamped to and follow the same procedure a...

Page 14: ...DETERMINE NUMBER OF SPONSOR PANELS BEING INSTALLED AND THEIR LOCATION 1 20 Long 1 1 2 x 1 1 2 Mounting Angle 8 3 8 16 x 3 4 Bolts 16 3 8 Flat Washers 8 3 8 16 Hex Nuts 22 8 x 1 2 Tek Screws 2 31 x 10...

Page 15: ...3 8 flat washers and 3 8 hex nuts The brack ets fit inside the panel The top for top mounted installa tions or the bottom for bot tom mounted installations of each panel is pre drilled for the bracke...

Page 16: ...at the scoreboard TESTING THE INSTALLED SYSTEM Please refer to the OPERATORS MANUAL for startup instructions 1 While holding down the OPTIONS button turn the wireless controller on 2 The screen will d...

Page 17: ...ssfully installed your Varsity Scoreboard 4 Press the down arrow again to display Digits Count All digits should continuously count from 0 9 5 If all digits turn on and count the installer can then tu...

Page 18: ...18...

Reviews: