Operation
2-2
2-2
SHUTDOWN PROCEDURE
a
Turn off the power to the diffusion pump. Continue to back the diffusion pump with the appro-
priate mechanical pump.
b
Allow cooling water to flow through the diffusion pump until the pump body temperature,
located just above the boiler plate, has cooled to a temperature of approximately 130°F.
Summary of Contents for VHS-6
Page 27: ...Replacement Parts 5 2 ...
Page 28: ...Replacement Parts 5 3 ...