background image

 

Varian,Inc. 

2700 Mitchell Drive 

Walnut Creek, CA 94598 U.S.A. 

 

03-914961-00:6 

1

 

of 24 

1200/1200L MS Pre-installation Instructions

 

1200/1200L GC/MS and LC/MS 

Pre-installation Instructions 

 

Congratulations on your purchase of the Varian 1200 Quadrupole Mass Spectrometer.  The 

information provided in this pre-installation guide will help you prepare your installation site for 

your Varian 1200 GC/MS, 1200L GC/MS, 1200L LC/MS, or 1200L GC/LC/MS system. Use the 

general requirements and the appropriate section of these pre-installation instructions as a 

guide while preparing the installation site.  When your site meets all the requirements detailed 

in these instructions, contact the Customer Service office in your region to schedule installation. 
The Varian 1200L LC/MS and 1200/1200L GC/MS have been designed to operate reliably 

under carefully controlled environmental conditions. It is the responsibility of the customer to 

provide a suitable location, power source, and operating environment. Operating or maintaining 

a system in operational conditions outside of the power and operating environment limits 

described in this manual could cause failures of many types. The repair of such failures is 

specifically excluded from the Warranty and Service contract conditions. 

CAUTION

 

All phases of the installation site preparation must conform to 
local safety, electrical, and building codes. These codes take 
precedence over any recommendations in these instructions, 
and compliance to them is the responsibility of the customer. 

 

 

General Requirements..................................................2

 

Operating Environment ...........................................2

 

Temperature/Humidity.............................................2

 

Particulate Matter ....................................................2

 

Vibration ..................................................................2

 

Exhaust System ......................................................2

 

1200 GC/MS.................................................................3

 

Entrance..................................................................3

 

Space and Load Requirements...............................3

 

Power Requirements 1200 GC/MS.........................4

 

Gas Requirements 1200 GC/MS ............................5

 

1200L GC/MS...............................................................6

 

Entrance..................................................................6

 

Space and Load Requirements...............................6

 

Power Requirements 1200L GC/MS.......................7

 

Gas Requirements 1200L GC/MS ..........................8

 

1200L LC/MS..............................................................10

 

Entrance................................................................10

 

Space and Load Requirements ............................ 10

 

Power Requirements 1200L LC/MS...................... 11

 

Gas Requirements 1200L LC/MS ......................... 12

 

Solvent Requirements 1200L LC/MS.................... 13

 

1200L GC/LC/MS ....................................................... 13

 

Entrance................................................................ 13

 

Space and Load Requirements ............................ 13

 

Power Requirements 1200L GC/LC/MS ............... 14

 

Gas Requirements 1200L GC/LC/MS................... 15

 

Solvent Requirements 1200L LC/MS.................... 18

 

Instrument Arrival ....................................................... 19

 

Inspection.............................................................. 19

 

Unpacking and Installation.................................... 20

 

Spare Parts ........................................................... 20

 

Preventive Maintenance ....................................... 20

 

Appendix 1.  Module Specifications............................ 21

 

Appendix 2.  Power Consumption .............................. 22

 

Appendix 3.  NEMA Plugs and Power Outlets............ 24

 

Summary of Contents for 1200 GC/MS

Page 1: ...e relative humidity can be maintained between 40 80 The lab is free of particulate matter The system workbench is free from vibrations The system area is free from electromagnetic disruption and elect...

Page 2: ...in this manual could cause failures of many types The repair of such failures is specifically excluded from the Warranty and Service contract conditions CAUTION All phases of the installation site pre...

Page 3: ...densation Operating the mass spectrometer at very low humidity may result in the accumulation and discharge of static electricity shortening the life of electronic components Operating the system at h...

Page 4: ...hrough doors CAUTION The 1200 MS foreline pump and gas chromatograph are heavy items that require at least two fit people for lifting and moving safely Space and Load Requirements The recommended layo...

Page 5: ...on devices or test equipment we recommend a separate dedicated power source for their operation Never plug the mass spectrometer and the chromatograph into the same power source or you may overload th...

Page 6: ...ferably flame treated or solvent washed Ammonia 5 0 Research Grade 99 999 purity A two stage 0 15 psi 0 1 bar pressure regulator that has a stainless steel diaphragm is recommended The output pressure...

Page 7: ...ation Your GC Accessory Kit includes a GC MS Gas Clean Oxygen Moisture filter CP 17973 and filter base This easy to remove gas filter cartridge combines three highly adsorptive materials in one filter...

Page 8: ...hin 10 ft 3m of the rear of the 1200L NOTE See Appendix 1 for exact module specifications Power Requirements 1200L GC MS The 1200L GC MS system requires one dedicated duplex single phase power source...

Page 9: ...1200L GC MS CI Reagent Gases The CI mode for the 1200L MS typically uses methane isobutane or ammonia The amount of gas consumed during CI operation is approximately 1 to 2 mL min The CI reagent gas...

Page 10: ...ate precautions when using Anhydrous Ammonia and for compliance with all governmental regulations It is the operator s responsibility to understand and adhere to all safe laboratory practices concerni...

Page 11: ...sed with your filter 1200L LC MS Entrance Before arranging for delivery of the 1200L LC MS to your facility please make sure that all passages to the site of installation are at least 36 in 91 5 cm wi...

Page 12: ...rces with earth grounds hard wired to the main power panel ground and one 230V 20A power source One of these fourplex power sources is for the mass spectrometer computer and monitor the other fourplex...

Page 13: ...he CEE 7 7 plug and outlet are shown in Appendix 3 Figure 5 c Gas Requirements 1200L LC MS Nitrogen A Nitrogen gas supply capable of providing up to 12L min of gas regulated at 80 psi is required as a...

Page 14: ...ld always be kept to a minimum Semiprep and Preparative systems have other requirements limitations with regard to interconnect tubing Typically a system using flow rates up to 200 mL min will require...

Page 15: ...power sources with earth grounds hard wired to the main power panel ground for the HPLC MS and computer and one 230V 20A power source for the foreline pumps If you have additional sample preparation d...

Page 16: ...g and corresponding outlet are shown in Appendix 3 Figure 5 a NEMA 5 20P plugs are rated at 20A and 120 Vac The power cables for the computer monitor and printer are approximately 78 in 2m long They a...

Page 17: ...the line be as short as possible Methane 5 0 Research Grade 99 999 purity A two stage 0 15 psi 0 1 bar pressure regulator that has a stainless steel diaphragm is recommended The output pressure to the...

Page 18: ...Carrier Gas Helium Helium is required as a carrier gas for the GC with a minimum 99 999 ultra high purity and less than 1 0 ppm each of water oxygen and total hydrocarbons The minimum requirement is o...

Page 19: ...ing or installation of modules to existing HPLC systems For most analytical HPLC systems flow rates up to 10 mL min 1 16 tubing with an internal diameter ID of 0 005 can be used throughout However 0 0...

Page 20: ...with the observations Contact the appropriate Varian office to report the damage If no external damage is apparent receiving documents should be signed Received but not inspected to indicate that the...

Page 21: ...ted and you have accepted the conditions of delivery Spare Parts The 1200 1200L Hardware Operation Manual provides a list of spare parts for routine operation Preventive Maintenance The customer is re...

Page 22: ...325 Photodiode Array Detector 8 3 21 2 11 7 29 6 18 7 47 5 34 15 5 ProStar 330 Photodiode Array Detector 9 3 23 5 10 2 26 20 50 35 16 ProStar 335 Photodiode Array Detector 8 3 21 2 11 7 29 6 18 7 47...

Page 23: ...to 12 in 15 to 30 cm Allow vertical clearance above the instrument Dissipate heat and allow for routine maintenance 30 in 76 cm Allow additional bench space beside the Workstation keyboard Enable mous...

Page 24: ...5 Laser Printer 3 4 1 5 2 Never plug the mass spectrometer and the chromatograph into the same power source otherwise you may overload the power source Never use the free outlet on any of the power s...

Page 25: ...orten device lifetime It is important to establish the quality of the line power in your laboratory prior to installation of the 1200L LC MS and or GC MS Occasionally line power sources may be of unac...

Reviews: