Step 1: Clamp a small board or metal angle across the bottom aft edge of the F-1202B Panel Base to prevent it from getting buckled/damaged.
Step 2: Remove the rivets that attach the F-1202J-L & -R Stack Angles, and F-1202K-L & -R Inst Stack Supports to the F-1202B Panel Base.
See Page 29-04 Figure 4.
Remove the rivets attaching the F-1202A-1 Instrument Panel to the F-1202B Panel Base. See Page 29-07 Figure 1.
Remove the F-1202A-1 Instrument panel.
NOTE: In the SkyView installation the connection of the pitot and static lines to their pressure transducers
is made in the tailcone. The plastic tube running from the forward fuselage to the tailcone was previously
used as the Static Line has now become the Aft Pitot Line.
Step 3: Pull the Aft Pitot Line back through the F-1202B Panel base and all the bulkheads back to
the area of the fuel pump behind the F-1204 Center Section Assembly.
NOTE: Making holes and cutouts in this section will result in metal debris that must be
removed fromthe aircraft. Layout a cloth beneath the working area to help with cleanup.
Deburr all holes after drilling. See Section 5B.
Step 4: Final-Drill #27 the center six holes in the F-1202B Panel Base. See Figure 2.
Draw a center line across the center of the six #27 holes to help in orienting the
nutplates for the next step. See Figure 2.
Step 5: Use a #6 screw to position a nutplate as a drill template at each of the
six holes final-drilled in Step 2. Use the center line to show when the nutplate
is horizontal.
Match-Drill #40 each nutplate's attach holes into the F-1202B Panel Base.
Cleco the first nutplate attach hole before match-drilling the second hole.
Step 6: Dimple the 12 nutplate attach holes made in Step 3.
Step 7: Dimple then rivet nutplates to the F-1202B Panel Base as
shown in Figure 1.
PAGE
REVISION:
DATE:
VAN'S AIRCRAFT, INC.
MATCH-DRILL #40,
12 PL
FIGURE 2:
DRILL FOR NUTPLATE
INSTALLATION
FINAL-DRILL #27,
6 PL
CENTER LINE
F-1202B
SEE
FIGURE 2
DATE:
F-1202B
FIGURE 1: AFT PITOT LINE
CONNECTION AND
NUTPLATE INSTALLATION
2X AN426AD3-3.5
K1000-06
9X
42D-03
0
10/03/11
REVISION:
RV-12
FF-1216 (SHOWN
FOR REFERENCE ONLY;
SUPPLIED IN THE
POWERPLANT KIT)
AFT PITOT
LINE