
FIGURE 1: ADDING UPDATE
HARNESSES OVERVIEW
Step 1: Attach the WH-00036 Tunnel Conversion Harness to the WH-RV12-TUNNEL harness using
ES-00164 4-40 F/F .250 1/4 Hex Standoff. Place a drop of blue Loctite on the threads of each thumb screw
then fully tighten them into the d-sub backshell interconnects. See Figures 1 and 2.
Step 2: Attach the WH-00026 Option Conversion Harness to the WH-RV12-OPTIONAL harness using
ES-00164 D-Sub Backshell Interconnects. Place a drop of blue Loctite on the threads of each thumb screw
then fully tighten them into the d-sub backshell interconnects. See Figures 1 and 2.
Step 3: Tie-Wrap the WH-00036 Tunnel Conversion Harness to the WH-00026 Option Conversion Harness
where the wires exit each backshell.
Step 4: Tie a note to the cushioned clamp to tie-wrap the WH-RV12-TUNNEL harness to the wires going
through the cushioned clamp near the left ES CPU FAN on either side of the clamp when all wiring has been
completed in Section 42C. This will allow the update harnesses to be moved during installation of the
SkyView avionics system.
TIE-WRAP
ADD NOTE
TIE-WRAP EACH SIDE OF
CUSHIONED CLAMP
CUSHIONED CLAMP
WH-00026
WH-00036
WH-RV12-TUNNEL
WH-RV12-OPTIONAL
FIGURE 2: CONNECTING UPDATE
HARNESSES EXAMPLE
ES-00164,
2 PL
BACKSHELL,
2 PL
THUMB SCREW,
4 PL
BLUE LOCTITE,
4 PL
F-1202B
42D-19
0
10/03/11
REVISION:
RV-12
DATE:
PAGE
REVISION:
DATE:
VAN'S AIRCRAFT, INC.
Step 5 (No Lighting Kit Installed): Route WH-L435 (YEL/PRP) and WH-L436 (YEL/GRN) wires coming from
the WH-00026 RV-12 Option Conversion Harness down through the F-1202B Panel Base. Follow the ES RS
279-374 Phone Cable as described on Page 31-03 to the location of the ELT.
Cover the exposed end of each wire in heat shrink, coil the wire and tie-wrap the wire to the wires going to
the ELT.
Step 5 (Lighting Kit Installed): Find the WH-L435 (YEL/PRP) and WH-L436 (YEL/GRN) wires coming from
the WH-00026 RV-12 Option Conversion Harness.
Cut both wires three inches from the d-sub connector they are attached to.
Cover the end of each wire in heat shrink.
Step 6: There are several long wires left coming from the WH-00026 Option Conversion Harness and
WH-00036 Tunnel Conversion Harness. Route these wires down through a snap bushing in the F-1202B
Panel Base then follow the path of the WH-RV12-TUNNEL harness through the to the F-1202F Bulkhead.
Use the new wire run holes made in this section to route the harnesses to the aft side of the F-1203A
Bulkhead.