10
105454
DIRECT-VENT FIREPLACE (NATURAL/PROPANE)
®
VENTING
INSTALLATION
Continued
UP
UP
Horizontal Venting
Vertical (V)
Horizontal (H)
37" min.
10" max.
Figure 16 - Horizontal Termination
Configuration for Rigid Venting
Figure 17 - Horizontal Termination Configuration for Rigid Venting Using One
90
°
Elbow
Figure 18 - Horizontal Termination Using Flexible Venting
Horizontal Venting
Vertical (V)
Horizontal (H)
44" min.
29" max.
(30
°
and 90
°
only, no vertical pipe)
55" min.
41" max.
(30
°
elbow, 1' vertical pipe, 90
°
elbow)
67" min.
60" max.
79" min.
84" max.
96" min.
20' max.
Note: This configuration for use with
corner installation.
UP
Horizontal Venting
See information in
Figures 17 and 18 for
Vertical(V) and
Horizontal(H) maxi-
mums and minimums.
The same amounts
apply for flexible
venting.
BGFVK Vent Kit Shown
(recommended for use
with cabinet mantels)
BVK Vent Kit Shown
BFGFVK and FGFVK
Vent Kits Shown
Horizontal Termination
Configurations
Figures 16 through 20 show different con-
figurations for venting with horizontal ter-
mination. Each figure includes a chart with
vertical minimum/maximum and horizon-
tal maximum dimensions which must be
met. All connections must be sealed with
high temperature silicone sealant as speci-
fied in the second warning statement on
page 7. All horizontal terminations require
1/4" rise per 12" of horizontal run.