Vanguard Instruments VBT-75 S2 User Manual Download Page 14

REV 1

 

VBT-75 S2 USER’S MANUAL

 

 

11

 

 

 

 

3.4 

Updating Firmware 

The VBT-75 S2' firmware is user-upgradeable. The firmware version is displayed on the LCD 
screen during the start-up sequence when the unit is powered one. Follow the steps below to 
download and install the latest VBT-75 S2 firmware: 

a.

 

Visit the Vanguard web site at 

http://www.vanguard-instruments.com

. Login to your 

account using the login form on the left side of the page: 

 

If you do not have an account, click on the "Create new account" link below the login 
area to create your free account. Please note that your account will need to be 
approved first before it can be used to download any software or firmware. This is 
usually done within 30 minutes of creating your account. 

b.

 

After logging in to your account, hover your mouse over the "Downloads" link at the top 
of the page and click on the "Software/Firmware Downloads" link: 

 

c.

 

All Vanguard products will be listed along with any compatible firmware and software. 
Scroll down the page to find the VBT-75 S2 listing and then click on the firmware link to 
save the firmware file. 

d.

 

Once the download is complete, navigate to the folder where the file was downloaded 
and extract the compressed ZIP file (you may need to use a ZIP extraction application 
such as WinZip, 7-Zip, etc.). Once extracted, you should see the file "vbt75s2.hex". This 
is the firmware file. 

 

 

Summary of Contents for VBT-75 S2

Page 1: ...VBT 75 S2 VACUUM BOTTLE TESTER USER S MANUAL Vanguard Instruments Company Inc 1520 S Hellman Ave Ontario California 91761 USA TEL 909 923 9390 FAX 909 923 9391 July 7 2017 Revision 1...

Page 2: ...el or by an authorized repair service provider Unauthorized modifications can cause safety hazards and will void the manufacturer s warranty EQUIPMENT RATINGS IP Rating The enclosure for the VBT 75 S2...

Page 3: ...cators 4 2 0 CABLE CONNECTIONS 6 3 0 OPERATING PROCEDURES 7 3 1 Set the Date and Time 7 3 2 Changing the LCD Screen Contrast 8 3 3 Performing a Test 9 3 4 Updating Firmware 11 LIST OF TABLES Table 1 V...

Page 4: ...ST SETUP CABLE VT USER S MAN CONVENT the followin on the VBT 7 u names are creen output ected item o es are indica arning mess are indicate te details 07 06 11 03 G 0V UAL TIONS US ng conventio 75 S2...

Page 5: ...f 100 A 200 A or 300 A the test voltage is returned to zero and a Pass message is displayed If a flash over condition occurs such as bottle failure the test voltage is immediately turned off a Failure...

Page 6: ...urn cable on Shipping case i One year on pa ications are 25 C 77 F 2 Technical S vacuum bottle 7 W x 10 5 H x 4 53 Kg 2A 50 60 Hz dc in 5 kV steps harge time for i 20 characters x ght sunlight an d pr...

Page 7: ...unctional description in Table 2 The table describes the function of each item on the control panel The purpose of the controls and indicators may seem obvious but users should become familiar with th...

Page 8: ...ac 2A 50 60 Hz F3AL 250V Input power connector with built in fuse holder and power switch 5 GROUND VBT ground stud Connect ground stud to substation ground using the provided cable 6 TEST FAILED Test...

Page 9: ...typical BT 75 S2 aga s ground stu er must be o e under test ure 2 VBT 75 foot 3 05m ated with al cable conne inst static di ud to the sub off line and c t should be i 5 S2 Connect VBT 75 m high volta...

Page 10: ...ess the CONTROL KNOB c The following screen will be displayed Turn the CONTROL KNOB to select the first digit of the month and then press the CONTROL KNOB The cursor will move over to the second digit...

Page 11: ...NOB until the LCD CONT option is enclosed in brackets as shown below Press the CONTROL KNOB c The following screen will be displayed Turn the CONTROL KNOB clock wise or counter clockwise to adjust the...

Page 12: ...following screen will be displayed Turn the CONTROL KNOB clock wise or counter clockwise to increase or decrease the test voltage by 5 KV increments respectively 10 KV to 75 KV When the desired test v...

Page 13: ...ent as shown below h After the test time duration has elapsed the test results will be displayed If the leakage current did not pass the preset value set in step d the test voltage is returned to zero...

Page 14: ...ll need to be approved first before it can be used to download any software or firmware This is usually done within 30 minutes of creating your account b After logging in to your account hover your mo...

Page 15: ...r ommend us ed off insert CONTROL rough the ini ss The STA ot folder of ty flash drive rom the driv ing a flash d t the USB Fla L KNOB t itial starting RT UP men VBT 75 a USB Flash e Please bac ve riv...

Page 16: ...S Hellman Ave Ontario CA 91761 USA Phone 909 923 9390 Fax 909 923 9391 www vanguard instruments com Copyright 2017 by Vanguard Instruments Company Inc VBT 75 S2 User s Manual Revision 1 0 July 27 201...

Reviews: