background image

00

 

 

IPN.

IAM.

10°

3109

68

0

600

1700

3128

Advised pitch measure 5000 (Based on sun angle of 14,5°)

2700

825

Panel Leng

th

Pa

ne

l th

ick

ne

ss

 28

-5

0

Summary of Contents for ValkTriple

Page 1: ...Installation manual ValkTriple Version 01 December 2021...

Page 2: ...le zone of the roof Index Disclaimer Select wind area Page Required ballast Page Required tools Page 00a Required materials Page 00b General dimensions Page 00c Placing roof carriers Page 01 A frame c...

Page 3: ...n calculation Mounting systems for PV panels placed on flat roofs should either be mechanically attached to the roof or need to be supported by ballast to make sure that the solar mounting system is u...

Page 4: ...er I 29 5 m s 213 0 213 0 264 0 X X kg 24 0 24 0 29 5 X X tiles II 27 m s 142 0 142 0 184 0 235 0 276 0 kg 16 0 16 0 20 5 26 5 31 0 tiles III 24 5 m s 78 0 78 0 112 0 154 0 187 0 kg 9 0 9 0 12 5 17 5...

Page 5: ...0 158 0 kg 3 5 7 5 11 0 14 5 18 0 tiles 25 m s 50 0 90 0 121 0 158 0 188 0 kg 6 0 10 0 13 5 18 0 21 0 tiles 26 m s 70 0 113 0 147 0 188 0 220 0 kg 8 0 13 0 16 5 21 0 24 5 tiles Building height 0 5 met...

Page 6: ...65 0 65 0 kg 7 5 7 5 7 5 7 5 7 5 tiles 3 27 5 m s 121 0 121 0 121 0 121 0 121 0 kg 13 5 13 5 13 5 13 5 13 5 tiles 4 30 m s 183 0 183 0 183 0 183 0 183 0 kg 20 5 20 5 20 5 20 5 20 5 tiles Building heig...

Page 7: ...indmap United Kingdom Required ballast United Kingdom General The ValkTriple mounting system must be reinforced by means of tiles which must be placed on the indicated ballast foundations In three ste...

Page 8: ...iles which must be placed on the indicated ballast foundations In three steps you can easily calculate the required ballast determine the wind area on the windmap choose the wind area and building hei...

Page 9: ...m s 244 0 244 0 265 0 X X kg 27 5 27 5 29 5 X X tiles 31 m s X X X X X kg X X X X X tiles Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 22 m s 88 0 88 0 103 0 138 0 167 0 kg 10...

Page 10: ...nicipalities Aurland 25 Eid 26 Fjaler 26 F rde 26 F rde near the Jostedalsbreen 26 Gaular 26 Gloppen 26 Gloppen near the lfotbreen and Jostedalsbreen 26 Hornindal 26 Hyllestad 26 H yanger 26 L rdal 26...

Page 11: ...s 5 0 38 0 65 0 96 0 121 0 kg 1 0 4 5 7 5 11 0 13 5 tiles 25 m s 23 0 59 0 87 0 121 0 149 0 kg 3 0 7 0 10 0 13 5 17 0 tiles 26 m s 41 0 80 0 111 0 148 0 177 0 kg 5 0 9 0 12 5 16 5 20 0 tiles Building...

Page 12: ...8 0 11 0 15 0 18 0 tiles 26 m s 124 0 175 0 215 0 263 0 X kg 14 0 19 5 24 0 29 5 X tiles Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 21 m s 37 0 76 0 107 0 143 0 172 0 kg 4 5...

Page 13: ...r 12 15 meter 1 58 0 82 0 101 0 124 0 144 0 kg 6 5 9 5 11 5 14 0 16 0 tiles 2 161 0 194 0 221 0 254 0 281 0 kg 18 0 22 0 25 0 28 5 31 5 tiles 3 58 0 82 0 101 0 124 0 144 0 kg 6 5 9 5 11 5 14 0 16 0 ti...

Page 14: ...0 147 0 184 0 228 0 264 0 kg 14 0 16 5 20 5 25 5 29 5 tiles 27 m s 150 0 174 0 214 0 262 0 X kg 17 0 19 5 24 0 29 5 X tiles 29 m s 205 0 232 0 278 0 X X kg 23 0 26 0 31 0 X X tiles Building height 0 5...

Page 15: ...ng height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 27 m s 150 0 174 0 214 0 262 0 X kg 17 0 19 5 24 0 29 5 X tiles 30 m s 233 0 262 0 X X X kg 26 0 29 5 X X X tiles Building height 0 5 met...

Page 16: ...00 Recommended installation tools ValkTriple Cordless drill for socket 13 and bit T 30 Socket 13 Torx bit T 30 Measuring tape Wrench 13...

Page 17: ...n Page 03 Alu profile 2100mm 7272100 Alu profile 1010mm 7271010 Alu extension profile 757050 1010 1046 mm 757051 1038 1065 mm 757052 1065 1100 mm Installation Page 04 Alu hinge 50mm 724450 Installatio...

Page 18: ...00 10 3109 680 600 1700 3128 Advised pitch measure 5000 Based on sun angle of 14 5 2700 825 Panel Length P a n e l th ic k n e s s 2 8 5 0...

Page 19: ...w Detail B 1 Detail B 2 Front view 825 3rd hole Place the mass block on the rubber tile carriers Detail B 3 15 Nm Attention the 1600mm roof carrier is placed in front of the 1000mm roof carrier Mount...

Page 20: ...he groove on the bolt corresponds with the orientation of the bolt head A A A 5th to last hole 2nd hole Detail B 15 Nm Mount the connector pieces on the roof carriers Make sure they are placed as show...

Page 21: ...Detail A A The groove on the bolt corresponds with the orientation of the bolt head Detail B A 4th Hole 4th hole from end roof carrier 15 Nm Mount the push rods on the roof carriers to connect the two...

Page 22: ...e aluminium profile with the connector pieces coupling first Then mount the profile to the roof carrier ValkHint ValkHint Detail A A Detail A 2 15 Nm 15 Nm 15 Nm Mount in 3rd hole Mount in last hole M...

Page 23: ...04 2 Detail A A Side view Extension piece for panel width 757050 1010 1046 mm 757051 1038 1065 mm 757052 1065 1100 mm...

Page 24: ...05 A Detail A Mount the push rods between the aluminium profile and the roof carrier Diagonal rod M8x80 15 Nm M8x80 15 Nm...

Page 25: ...06 A Detail A For the required number of tiles check the ballast tables in front of this manual 15 Nm A 2 extra tiles 4 extra tiles 6 extra tiles 8 extra tiles...

Page 26: ...if it s slot for an easier assembly Step 2 Step 3 Panel height Step 4 Put the end clamp in the right slot to contine the assembly Step 5 8 Nm The end clamp can only be turned clockwise so make sure t...

Page 27: ...08 A A Detail A Attention Do not forget to install the end clamp above the third panel Same installation as other end clamps page 07 A A 8 Nm Step 1...

Page 28: ...09 Mount cable clamp on the panel...

Reviews: