5
GB
9.694.004 V1.04
ENGLISH
MD 850
Before Starting
Set-Up and Function
Sealing and Printing Operation Sequence
1. After inserting the sterilization package switch on transport.
2. The sterilization package is then transported and the area of the sealing seam is heated to the sealing temperature
set on the upper and lower heating dies.
3. The hot seam is pressed together by the sealing roller sealing it.
4. The printing operation is activated and the activated print data is printed onto the sealed package.
5. The finished sterilization package is transported to the discharge side.
6. If more packages to be sealed are not fed in the transport mechanism shuts off after approx. 30 s.
3
Power switch
Power fuse
Power connection
Peel edge adjustment
5 - 30 mm
Input and
function keys
Display
Adjustable for the user manual