Valor PORTRAIT 922ECN Installation & Operating Instructions Manual Download Page 2

2

Designed and Manufactured by

Miles Industries Ltd.

 190 – 2255 Dollarton Highway, North Vancouver, BC, CANADA  V7H 3B1

Tel. 604-984-3496  Fax 604-984-0246

www.valorfireplaces.com

© Copyright Miles Industries Ltd., 2011

2

We recommend that our gas 

hearth products be installed 

and serviced by professionals 

who are certified in the United 

States by NFI (National Fireplace 

Institute

®

).

Thank You ...

For purchasing a Valor by Miles Industries. Your new radiant gas heater is a technical 

appliance that must be installed by a qualified dealer. Each Valor fireplace is fully 

tested during the production process for your safety and comfort.

Your unit has been professionally installed by:

Dealer Name  _______________________________________

Phone Number  ______________________________________

Should you encounter an operational problem, call your dealer immediately.

Do not try to repair the unit as you may cause an injury or damage the fireplace

.

The information contained in this installation manual is believed to be correct at 

the time of printing. Miles Industries Ltd. reserves the right to change or modify any 

information or specifications without notice. Miles Industries Ltd. grants no warranty, 

implied or stated, for the installation or maintenance of your heater, and assumes no 

responsibility for any consequential damage(s).

Do not put 

furniture or other objects 

in this space in front of 

the fireplace:

36” (0.9 m)

Fireplace

Hearth

Summary of Contents for PORTRAIT 922ECN

Page 1: ...itable for installation in a bedroom or bed sitting room Manufactured by MILeS INDUSTRIeS LTD British Columbia Canada www valorfireplaces com Installation Operating Instructions Do not store or use ga...

Page 2: ...and comfort Your unit has been professionally installed by Dealer Name _______________________________________ Phone Number ______________________________________ Should you encounter an operational p...

Page 3: ...paration 8 Gas Supply Installation 10 Firebox Installation insert application only 11 Remote Control Installation 12 Ceramic Fuel Bed Installation 13 923ACF Adorn Cast Front Installation 15 Adorn Safe...

Page 4: ...ways BE KEPT CLEAN to provide for adequate combustion and ventilation air Always KEEP the appliance clear and free from combustible materials gasoline and other flammable vapors and liquids NEVER OBST...

Page 5: ...ight odor and could cause the flames to be the full height of the firebox or even slightly higher for the first few hours of operation It is also possible that these vapors could set off any smoke det...

Page 6: ...36 wide closure plate with black aluminum extrusion edge is available For installation instructions with Adorn cast front see Adorn cast front installation section in this manual For Windsor Arch cast...

Page 7: ...soundness Min vent liner Ht 9 0 Min Ht before 90 deg elbows is 9 0 Radiused offsets in liner are permitted Ceiling ceiling See mantel table A 36 min to combust mat l B Min 39 1 2 Center line Edge of...

Page 8: ...nd of the burner Push in the lighting knob and turn counter clockwise through the IGN position to PILOT A spark should flash across from the pilot electrode to the pilot burner shield Aeration Setting...

Page 9: ...the burner module Remove 2 screws and pull the burner module partially out of the firebox taking care not to pull on the wire leads going to vent switch With the module partly removed reach behind the...

Page 10: ...re test the supply line for leaks The appliance and its individual shut off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in...

Page 11: ...Insert a wall plug into each hole 5 Secure the collar on the vent connector unit to the 4 diameter chimney liner 6 Slide the firebox into the fireplace making sure that the vent connection unit is abo...

Page 12: ...tor on to the receiver circuit board The plug will only go on one way so please ensure that the wires are pointing up and slot in the board is in line with the tab on the wiring harness plug Connect w...

Page 13: ...on top of the base coal support as shown 2 Insert the right hand sidewall at an approximate 30 degree angle between the firebox side and the burner Swing the top of the sidewall to the vertical positi...

Page 14: ...box The side projection on this coal should be near the middle front of the firebox 3 Place the right front coal behind the metal lip at the front of the firebox Its left side should rest over the pro...

Page 15: ...p locates fully over the retaining brackets on the convection box see figure below 1 Locate the guard bottom wires over the ash lip 2 Hold the top springs down and swing the guard back 3 Release the s...

Page 16: ...cause the flames to appear more yellow or orange making the fuel effects glow less Too little aeration may result in black carbon forming and dropping into the firebox Check venting efficiency A chec...

Page 17: ...ing a soft bristle paintbrush after removing the safety guard We suggest that you remove the coals in the reverse order to that shown in fitting instructions Make sure that no particles are brushed in...

Page 18: ...2 Set the flame adjustment knob as far clockwise as possible 3 Turn the gas control knob clockwise to OFF NOTE The knob cannot be turned from PILOT to OFF unless it is pushed in partially Do not force...

Page 19: ...on for air from other household equipment or appliances iii Damage due to chemicals dampness condensation or sulphur in the fuel supply lines which exceeds industry standards i This warranty does not...

Page 20: ...720A200 30 Pilot pipe 030A226 31 Tubing nut 420K385 32 Pilot injector olive 720A196 33a Pilot injector NG 35 4002511 33b Pilot injector LPG 27 720A195 Code Description Part no 34 Flexible pipe assy 4...

Page 21: ...21 Replacement Parts 922 BODY 1 2 3 8 4 5 6 7 9a b 10 11 12 13 14 16a 16b 16c 17a b 18 19 20 38 37 36 23 22 21 15a b 24 25A B 26 27 28 29 41 32 42 31 40 39 34 35 47 52 50 51 49 48 44 45 46 30 33A B 4...

Page 22: ...22 22 Replacement Parts 53 54 57 56 58 55 59 60 61 62 63 64 72 71 70 69 68 67 66 65...

Page 23: ...del 922EC NG natural gas LPG propane Serial No Front Trim code description e g 549AFB Windsor Arch Purchase date mm dd yyyy Home Owner Name Address City Province State Postal Code Zip Phone Email Addr...

Page 24: ...Product Postage needed Were you given all documentation and manuals for your product YES NO Miles Industries Ltd 190 2255 Dollarton Highway North Vancouver BC V7H 3B1 Canada Fold here Online Warranty...

Reviews: