15
HeatShift plenum or duct plates framing
required (top, front or sides); see instructions
packed with HeatShift kit.
Combustible framing material
except
if using HeatShift front
outlet plenums LDK1 or LDK4:
in this case steel stud required
under outlet opening - see
instructions packed with
HeatShift kit
DO NOT use screws
in this zone!
Combustible wall finish
54” (1372 mm) max.
Non-combustible wall finish zone
Max. 1-1/4” (32 mm)
thickness combustible
wall finish allowed
20” (508 mm) min.
Combustible
framing material
Zero
clearance
standoffs
44-1/2” (1
130 mm) min.
11-1/4”
(285 mm)
5-1/4”
(133 mm)
11”
(279 mm)
1/2” (13 mm) non-combustible
cement board required.
(May be covered with max. 3/4”
(19 mm) combustible finish).
Combustible projections must
otherwise conform to allowable
mantel projections - see
Clearances to Combustible
Projections
section in this manual.
17”
(432 mm)
WARNING
Ensure weight of wall above is
NOT carried by the appliance.
Framing—Minimal
Planning